Ashok Datta's Profile
Ashok Datta's Experience
| Current : |
Director Projects, ProInteractive Services (India) Pvt Ltd |
|
| Technology Consulting | ||
| India, New Delhi / NCR | ||
Working from 2009 | ||
|
Brief summary :
Involved in the following 1. Electronic security which includes installation and AMC of CCTV, Access control and alarm systems. 2. Building management systems , at present limited to Fire alarm systems. 3. Facility management systems which includes both the technical and soft services. 4. Building construction which includes new building as well as renovation and alteration of existing buildings. | ||
| Previous : |
Head/VP/GM-Corporate Planning/Strategy, Army |
|
| Construction | ||
| India, Ahmednagar | ||
Worked from 1985 to 2009 | ||
Brief summary :
| ||
Sponsored Jobs
Featured Career Adviser
Ashok's communities
|
25777 members, 219 jobs, 570 articles, 564 questions, 612 debates, 371 idea contests.
|
|
21498 members, 613 jobs, 811 articles, 388 questions, 594 debates, 256 idea contests.
|
|
7099 members, 155 jobs, 185 articles, 127 questions, 243 debates, 133 idea contests.
|
Ashok's
contributions
I think to regulate the number of vehicles on road there could be one solution. On odd days allow odd numbered vehicle and on even dates allow even numbered vehicles. |
NO Metro is not the only solution for the growing traffic congestion. Following steps need to be taken on priority before the things go out of hand. Widening of existing road and infrastructure. The ring road was supposed to be without red-lights but... |
Use of Solar power can also save energy. Solar energy can be used for common area lighting as also street lighting. Use of led lamps are cheaper on the longer run. Very effectively they can be used for common area lighting. Use of occupancy sensors... |
Dear Jacob This is a huge property 2.1 lakh sft in area out of which 1.44 lakh sft is used space from basement to second floor. The task involves operation and maintenence of DG , transformet, HT /LT panels, UPS , HVAC, STP, Lifts, water supply with... |
Facility management - operational and transitional plan |
Related Topics
The recent prolonged crisis got me to thinking about project management's...
1 debates
, 5 idea contests
, 1 question
How to get twice as much done in half the time. As a Product Manager, you...
2 trends
, 7 insight
, 4 debates
, 1 idea contests
, 4 question
Generally, construction sites are considered as more unsafe than normal...
1 trends
, 6 insight
, 8 debates
, 11 idea contests
, 8 question
Viewers also viewed
|
2
(726 Points)
|
|
(53 Points)
|
|
10
(3,303 Points)
|





