| Current : |
Dy.G M, Adani Infrastructure and Developers Pvt. Ltd.(adani group) |
|
| Construction | ||
| India, Bhuj | ||
Working from 2010 | ||
|
Brief summary :
The project named as Construction of Samundri Township at Mundra, Gujarat . It consists of all type of facilities . We have added new techonogy for houses kown as Tunnel techonogy .In this tech. the wall and slab are casted in one pour and centring/shuttering is removed within 12 houres of casting and the total cycle is 7days . we are going to reduce the cycle to 5days to give more speed to the construction. In overall it is a very speedy process and also the carpet area increases by adopting this tech.I was the Incharge of all civil activities of this Tunnel Tech. and report to GM(Head Of Project) .Now I have been tranfered since 1.06.2009 at Adani Power Ltd. Tirora,Maharasta for the execution work of 3 units of 660MW Thermal Power Plants.At Present I am posted at C/O of Gujarat Adani Institute of Medical Sciences,Bhuj, Gujarat and working as an Incharge/DGM since March.2010. | ||
IGNOU |
|
| MBA/PGDM | |
| India | |
| From 1993 to 1997 | |
|
Brief summary :
After getting job in a Govt. PSU I thought to study further and I take admissiom in PGDCM and MBA simultaneously passed out both degrees in 1997 with Ist Div. This was a great achiement for me.Then I was honoured by Bharat Joyti Award and Yijay Shree Award by International Friendship Society of India. | |
Institution of Engineers ,Calcutta |
|
| B.Tech/B.E. | |
| India | |
| From 1985 to 1987 | |
Brief summary :
After getting Diploma in civil engg. in 1985 I passed section A,B of AMIE,Culcutta,India in 1987 then i joined IGNOU for MBA in 1993 and simultaneouoly joined Delhi Productivity councial ,Delhi for PGDCM in 1994 and passed both the PG degree in 1997 with good marks and in shortest time period. | |
| Recommendation |
| 360 Degree Feedback [?] |
|
|
Yogendra Singh Chauhan, Civil Engineer-Highway Roadway, AECOM Feedback given on: 13-Aug-2010 | Relationship: Business Partner | |
|
|
varsha, Head/VP/GM-Quality, frac Feedback given on: 20-Apr-2011 | Relationship: Manager | |
|
Prev1NextShowing 1 - 2 of 2 |
|
|
20186 members, 998 jobs, 1353 articles, 657 questions, 1356 debates, 633 idea contests.
|
|
35952 members, 590 jobs, 1219 articles, 574 questions, 1505 debates, 422 idea contests.
|
|
7792 members, 71 jobs, 705 articles, 199 questions, 1594 debates, 379 idea contests.
|
frequent meeting with employee at all level may be held by the employer and listen them and provide at the spot decision. Employer should have his phone open to all and have direct touch at any time. |
It is certain that in future billing will be paperless. |
I think there will be again boom in construction indusry as it was 2 year ago. |
I suggest that skiiled person should also be involved in addition of the stack holders. |
I am to say that time management is a very big challange to multiprojects.If time will be controlled that automatically the cost will controlled. |
|
|
attar singh, Dy.G M, Adani Infrastructure and Developers Pvt. Ltd.(adani group)
|
|
|
attar singh, Dy.G M, Adani Infrastructure and Developers Pvt. Ltd.(adani group)
|
|
26
(6,286 Points)
|
|
(661 Points)
|





