Build your professional network on facebook via our app Go to app
 
Chandra Bhaskar Production Engineer, ..
 
Chandra Bhaskar's Profile
Chandra Bhaskar
Production Engineer, ..
..
confidential
confidential
Bangalore, India
Toostep 
Professional summary
Chandra Bhaskar's Experience
Current :

Production Engineer, ..

Auto Ancillary
Previous :

Production Engineer, Motherson Sumi Systems Limited

Worked from 2009 to 2012

Brief summary :

Industrial Experience: 2.6+ Years Exp. Present Employer: Designation: Production Engineer (Production Planning and Control) Organization: Motherson Sumi Electric Wires, (A Division of Motherson Sumi Systems Limited). Company Profile: A Leading Manufacturer of Auto Electric Wires and Harnessing Industry Period: January 2009 to till Date. Nature of Job: Preparation of Daily, Monthly and long term Production Plans. Shift Management and Controlling the Man Power as per the Planning. Receiving the month requirements from customers. Day to Day Co-Ordination with Plant w.r.t. to raw material availability, Production dept and dispatches. To reduce material loss in the shop floor. Preparation of Production reports, Process Charts and down time analysis Assist in carry out the Month End Inventory of WIP, safety audits. To issue proper Instructions and Schedule to shop floor to get the work completed in scheduled time. Preparing and implementing action plans effectively to maximize overall equipment efficiency. Continuously working towards Quality, Productivity improvement through Kaizen, Poka-Yoke and 5S activities. Implementation of lean manufacturing techniques to identify the bottlenecks, reduce setup times by carrying out time and motion studies and streamline the processes eliminating non value added activities in the shop floor. PREVIOUS WORK EXPERIENCE: Organization: KULKARNI POWER TOOLS LTD , Pune, Maharashtra. Designation: Engineer (Design and Development) COMPANY PROFILE: Kulkarni Power Tools Ltd, ISO 9001:2000 certified company operational in developing and Manufacturing of Power tools and route blowers. Nature of job: To Design and Develop parts for power tools. To select Vendor for new project. To Prepare of bill of material, PPAP and APQP documentations and necessary quality checks for the critical components. To reduce the cost of the product by value engineering To carry our Assembly and work centre layout planning- Time and Motion studies in the assembly line, reducing the set-up times to improve productivity. 4 months experience @ Autoliv IFB India Pvt. Ltd. as project trainee Project: Productivity Improvement in an Automotive Seat Belt Assembly Line Using Lean Techniques . Summary of the project work: The approach involved reviewing the present material flow and sequence of operations in the existing production line. Value stream was mapped for the current state of a production line and the bottlenecks were identified. Lean Manufacturing techniques like Line Balancing, Kaizen, Poka-Yoke and Quick Changeover were used to minimize the Non-Value Added activities in the assembly line.

Previous :

Engineer, KULKARNI POWER TOOLS LTD

Pune

Worked from 2008 to 2011

Brief summary :

esign and Development engineer Tenure from 15 Jan 2008 - till Date Organization: KULKARNI POWER TOOLS LTD , Pune, Maharashtra. Designation: Engineer (Design and Development) COMPANY PROFILE: Kulkarni Power Tools Ltd, ISO 9001:2000 certified company operational in developing and Manufacturing of Power tools and route blowers. JOB RESPONSIBILITY: Design and Development of parts for power tools. Preparing process sheets and PPAP documentation. Vendor selection for new project. Preparation of bill of material and necessary quality checks for the critical component. Reducing the cost of the product by value engineering Assembly and work centre layout planning WORK EXPERIENCE: 6 months experience @ Autoliv IFB India Pvt. Ltd. Project: Productivity Improvement in an Automotive Seat Belt Assembly Line Using Lean Techniques . Summary of the project work: The approach involved reviewing the present material flow and sequence of operations in the existing production line. Value stream was mapped for the current state of a production line and the bottlenecks were identified. Lean techniques like Line Balancing, Kaizen, Poka-Yoke and Quick Changeover were used to minimize the Non-Value Added activities in the assembly line.

Chandra Bhaskar's Education

M.S. Ramaiah School of Advanced Studies/Coventry University

M.E/M.Tech/MS
India
From 2006 to 2007
Brief summary :

Manufacturing Systems Engineering

B.M.S Institute of Technology

B.Tech/B.E.
India
From 2002 to 2006
Brief summary :

Mechanical Engineering

 
 
 
 
Chandra's communities
28209 members, 169 jobs, 221 articles, 263 questions, 420 debates, 181 idea contests.
11280 members, 11 jobs, 114 articles, 82 questions, 269 debates, 73 idea contests.
 
 
Related Topics
Is Search Selection and Headhunting - is the same or different approach. If...
2 trends , 2 insight , 1 idea contests , 2 question  
Businesses and retail customers have an ever-increasing range of products to...
3 insight , 1 debates , 3 idea contests , 2 question  
The topic deals about bringing innovations in retail operations formats....
1 debates , 1 idea contests , 2 question