Topic : Construction Project Management
  Rate : 
Posted in Community :

Construction Planning & Management

 
Industry : ConstructionFunctional Area : Global Business(Strategy & Execution)
Activity:  684 views;  last activity : 03 03 2012 21:46:53 +0000
 
 Refer 121
Share
 
 
  Rate : 
 
 
Advantages Vs Limitations
9
 
 
 
 
2
7
2
Support   Support
Top Argument
1
0

This system is best suited for rapid construction where time is of essence along with quality. You get a finish which does not require any plastering. Saves time & money.Recyclable 100% & good returns even at the end of the life of the formwork.


By Amit Agarwal, Director, Sharp Formwork & Consulting Engineers Pvt. Ltd.  08 10 2010 02:28:06 +0000
 
Top Argument
1
0
Onlt the prime factor initial cost more and normally most of the big giants for real estate developers and builders also depend will their customers and bankers.If necessary to finish quickly then we go for otherwise no need......
By JAGADEESAN S, Project Leader/Managing Consultant, Project Consultant  04 02 2011 04:21:59 +0000
0
0
Fast & good finish construction with aluminum formwork The aluminum formwork method of construction is a new option for warehousing projects, manufacturing yards and storage space generating efficiency, productivity, savings and economical viability. On the other hand, this system panel allows in one...
By Dr. Anusheel K Sharma, Asst. Warehouse Manager, Landmark Group of Companies  | 03 03 2012 21:46:53 +0000
0
0
The aluminum formwork method of construction is a new option for warehousing projects, manufacturing yards and storage space generating efficiency, productivity, savings and economical viability. On the other hand, this system panel allows in one day to empty walls and concrete slabs simultaneously due to its vacuum cycle, which also provides insurance earthquake resistant behavior
By Dr. Anusheel K Sharma, Asst. Warehouse Manager, Landmark Group of Companies  | 02 29 2012 21:08:21 +0000
0
1
This system is very easy for unskill workers. Our company could produce aluminum form pin(16x50)&wedge (3x80mm). these set used with aluminum forms in construction. If anybody interested please contact me at formworkaccessory@126.com.
By kenne , sale manager, hebei hualin  | 04 02 2011 01:59:55 +0000
0
0
Yes, aluminum form work help us to work fast.
By SHRIKANT MANOHAR DANKE, Project Manager, Phadnis Infrastructur Ltd  | 03 02 2011 07:14:31 +0000
0
1

One More thing is there in terms of aluminium composite panel. ACP is metal fram work so chances of heat conduction are more ,to avoide this people use wool as an insulation is already in practice, but the process of filling gool insulation and cost of making tray,and appication complex make its cost on higher side. If we use Extruded polystyrene foam in place of glass wool , application become more fast , more effective, durable and cost effective too.

25 MM xps has almost same insulation value what 50mm of glasswool. it is high resistence rigid foam. and doesnt  have any water pick up properties, so thermal properties remain same through out same its life. one can cut it as per the size of panel and use it with out and tray .so process become  faster, durable and cost effective, there are no wastageof material as well.

Pankaj negi

9820119684

ps_negi@spl.co.in


By pankaj negi, Asst Manager- Marketing ,Brand Promotion, M/S Supreme Petrochem Ltd  | 09 28 2010 06:26:07 +0000
0
1

Amit I agree with you. 

This type of construction provides more seismic resistance to the structure and increased durability.  And more over lesser number of joints thereby reducing the leakages and enhancing the durability. 


By Venkatesh M, Warehouse Manager, Larsen and Toubro  | 08 11 2010 13:13:21 +0000
0
0
As per my experience..no formwork system can be best, various parameters/factors determines formwork system selection. Aluminium system is mostly suited for typical structures which needs to be casted homogenously and have restricted cycle time. I would certainly go for conventional formwork where the cycle time is more than 7 days instead of paying off huge amount. If repetition is a sale point..then I would say each day a new system enters the market...how long are we actually be using the so called ''N repetitions'' system...i would rather suggest to for the latest technology instead of investing huge amount and waiting for it to nutralize neglecting latest technology systems in market.
By Sarang Acharya, Formwork Incharge, Vascon Engineers Ltd.  | 02 29 2012 10:00:27 +0000
Leading recruitment firm
  • Create a confidential Career Profile and Resume/C.V. online
  • Get advice for planning their career and for marketing of experience and skills
  • Maximize awareness of and access to the best career opportunities
Viewers also viewed
Steel shuttering is a better option or wooden shuttering for civil engieering constrution...
 
177 referals 48 arguments, 2932 views
As everyone knows about the importance of Lean thinking in the Construction process as customers...
 
12 referals 10 votes, 2940 views
The increasing cost of construction rehabilitation, led by escalating raw materials and labour...
 
250 referals 10 votes, 2399 views
more...  
Recent Knowledge (1)
These days as I switch on the tv or radio or look at a hoarding I do feel that power of ads I...
 
3004 referals 23 arguments, 492 views
more...  
More From Author
besides being reusable for the number of times, it is light in weight so it does not cause fatigue to the person doing the shuttering it being modular, interchangability is it at its best.
Hi Alagappan, Modern Construction techniques constitute basically with the desired quality output throughput with optimised costing design engineering. When we speak of optimised costs design engineering, we need to evaluate the cost of the technology...
Time stands testimony to so many instances events where if each one of us at our levels capacity did think in the right context of 'Saving the World' could have made so many unfortunate events avoidable. No offence meant, but I agree with Mr....