erection 
1
VS
0
 precaution
G.M.KHAN  |  Argues in support of  "erection"  |  6 months ago
precaution to be taken before heavy erection in construction.
 support: 
 
 
Debate: "precaution before heavy structure erection" deleted from your view.
Undo
 
(rate this)
Sujeet Vishwakarma  |  Answered  |  1 year ago
I hopr these ABCDs Simplify things ABCD- Assignment based on Completion Deadlines - Project. ABCD- Agenda Based on Configurational Dimensions - Portfolio.
JAGADEESAN S  |  Answered  |  1 year ago
something done in different type work completion may be project. The same work done in specific type of work.
 
 
Answer: "what is difference between project and portfolio?" deleted from your view.
Undo
 
 
Answer: "how to handle a EPC project and tips to be at glance" deleted from your view.
Undo
 
(rate this)
By : G.M.KHAN, Sr. Engineer(Mech.)  | New post
 
 
Answer: "safety precaution to be taken during erection " deleted from your view.
Undo
 
(rate this)
 Sir, I would like to know before handling any job related with structural fabrication what are the basic needs to make it profitable with in time sechedule.
vagish mani tripathi  |  Answered  |  3 years ago
           To get maximum profebility we have to follow fabrication tips as following .   -  Maximum utilistion of materials because it is measure part of initial investment If you have space so you can stablish fabrication shop it will help you...
 
 
Answer: "what is the points to suceed in structural fabrication field" deleted from your view.
Undo
 
(rate this)
 Sir, I would like to know before handling any job related with structural fabrication what are the basic needs to make it profitable with in time sechedule.
By : G.M.KHAN, Sr. Engineer(Mech.)  | New post
 
 
Answer: "what is the points to suceed in structural fabrication field" deleted from your view.
Undo
 
(rate this)
Sir, Kindly tell me what is the best way to do the fabrication of structures related with steel plant and what is the rule for controlling cost ,manpower, consumables.
By : G.M.KHAN, Sr. Engineer(Mech.)  | New post
 
 
Answer: "fundas for cost saving" deleted from your view.
Undo
 
(rate this)
Sir, Kindly tell me what is the best way to do the fabrication of structures related with steel plant and what is the rule for controlling cost ,manpower, consumables.
SHIVENDRA KUMAR JHA  |  Answered  |  3 years ago
Please take following steps:- Get all the Good for construction drawing - it will avoid rework in future.Doing modification in erected steel structures is very clstly. Steel market is very volatile- hence, look for the time when is down procure...
sankararanarayanan Balakrishnan  |  Answered  |  3 years ago
Finding out sources of raw materials  at cheaper rates meeting the quality requirements standardise the product to the maax possible extent to avoid wastages to minimum Use of appropriate technology-methods/machines depending the volume of prodn...
 
 
Answer: "fundas for cost saving" deleted from your view.
Undo
 
(rate this)
Ajit  |  Answered  |  4 years ago
In addition to what Vivek said add ' Foresee the bottlenecks and  think the solutions.  Please remember 'Time on planning is never lost' Major Ajit Raka [Retd.] Team Leader
Vivek Singh  |  Answered  |  4 years ago
Correct logistic planning is the key for construction projects. The second key is the capability of managers to take situational decisions. Other things follow.
 
 
Answer: "what are the basic fundas to complete the constuction target on sechedule" deleted from your view.