Build your professional network on facebook via our app Go to app
 
 
Started by : reena singh, Marketing, Ariisto House   07 19 2010 08:29:39 +0000
Activity:  42 views;  last activity : 03 10 2011 05:35:33 +0000

The use of pre engineered steel buildings in the commercial as well as residential sector is increasing day by day. Some of the main reasons for this popularity are the low cost of construction, reduction in the time taken for the cosntruction, environment friendly construction etc. However, there are a few factors to consider before selecting a pre engineered buildings to extract the maximum benefits out of it and to ensure long durability.

 



 
 Refer 95
Share
 
 
  Rate : 
 
 
 
 
  5 2 0
 
 
 
 
 
 
 
 
 
1 2 3
1 factors of peb's
2 Utility factors
3 improvement in matirials..

factors of peb's

idea posted by reena singh Marketing, Ariisto House

1) Legal formalities : Although pre engineered buildings are easy to construct and take a much lesser time to be erected at the construction site, yet there are a few legal formalities that have to be take care of. The building should be of an authorized design and should comply with all legal norms like fire safety, electric norms, etc. All these legal formalities should be complied with while designing and constructing pre engineered steel buildings, in order to get approval from the government.

2) Monetary factors: It is essential to carefully study the total expenditure estimate provided by the steel buildings supplier in order to check for any discrepancies. As a buyer, you should compare the expenditure estimates provided by different suppliers, so that the best deal could be selected. However, price should not be the only consideration while selecting a steel building supplier. If the same deal is offered at different prices by different suppliers, then the reason for such a discrepancy should be analyzed. It is not advisable to compromise on quality for a lower price.

3) Quality of material used: The most crucial component of a pre engineered building is the quality of material used in the construction activity. Steel is the main construction material used  in pre fabricated steel buidings. Therefore it is essential that the best quality steel is used, to ensure maximum effectiveness and durability. Other materials such as insulation panels, flooring material, electrical components, etc should also be of high quality for proper effectiveness.

4) Construction time: Although the construction time for pre engineered steel buildings is comparatively lesser than that of conventional buildings, yet different steel building supplier offer different construction time. Generally the whole process of fabricating and erection takes around 60-90 days. This time span should be clearly discussed before finalizing the project to avoid any ambiguity in the future.

5
0
  

yes i agree to u

0
  
by Diwakar Tiwari, Sr. Manager, THE Arvind LTD  | 07 22 2010 09:53:26 +0000

Reena as per my view legal formalities and quality of material used are most important things in this area. So, all have to see it .

 

0
  

i agree with miss reena that for using pre-fabricated houses there may be a legal angle.such houses are being used in middle east countries ,by contractors where use may be made ror a few yrs.i believe that in india , local bodies can be convinced to allow use of tempary sheds afer a structual engineer has certified safety of structure.

bpagarwal

Add your argument:

Utility factors

idea posted by Mohammad Bakhsh Project Leader/Managing Consultant, Freelancer

 Apart from what Ms Reena spelled out,  pre engineered steel building must comply with latest ISO specification.The utility factor must be considered before opting for  these structures.

2
0
  

Yes Sir, very correctly said. Utility should be considered before going for it. Thanks for referral , Jagadeesanji.

0
  
by reena singh, Marketing, Ariisto House  | 07 22 2010 07:23:20 +0000

yup thanx dear..........

Add your argument:

improvement in matirials..

idea posted by hardik Vagadiya Technical Recruiter, Modern Ballistic Solutions

I agreed but now-a-days there is very effective improvement in raw materials.

0
0
  
by reena singh, Marketing, Ariisto House  | 07 21 2010 16:59:33 +0000

i didn't get u r idea dear???????????????

Add your argument:

Add your Idea
Idea* : 
Add your argument:
edit in rich text ...
Could not find any idea interesting in: "Factors to consider before selecting a pre engineered steel building " ? Click here to add a new idea...

Found the idea contest "Factors to consider before selecting a pre engineered steel building "  interesting ?  Click here to refer to your connections and communities
Part of Randstad, the world’s second largest HR services company
  • Create a confidential Career Profile and Resume/C.V. online
  • Get advice for planning their career and for marketing of experience and skills
  • Maximize awareness of and access to the best career opportunities
Viewers also viewed
I want to know which is better steel or concrete
 
8 referals 50 arguments, 2458 views
Steel shuttering is a better option or wooden shuttering for civil engieering constrution...
 
177 referals 48 arguments, 2932 views
Your brand image makes people think in a certain way about you or your business. Having a...
 
1078 referals 8 votes, 1120 views
more...  
Recent Knowledge (4)
When we are watching news channels or any other channel or reading news papers you bump upon...
 
2022 referals 11 votes, 200 views
we all know the perils of talking on cell phones while driving. besides being hazourdous to...
 
290 referals 2 votes, 36 views
more...  
More From Author
c guys its all depend like at staring point of career one cannot go for business ,because....we need to learn first how to run an organization....and watching each an every activity of people present.....so after then learning many things.....we can go...
more...