The traditional design-bid-build approach, based on the owner, architect and contractor triad, has demonstrated several limitations within the  building type. These limitations generally center on cost control and schedule delays.

Both of these factors—cost and schedule—are so critical that any project-delivery approach that can lessen the uncertainty associated with them will produce a dramatic decrease in risk to the owner. Delays and cost overruns in  projects will negatively affect time to market in a production facility.

http://www.collaborationboard.com/images/543_collaboration.jpg

A better collaboration among all the factors will definitely help in achieving the target.

So, how can collaboration help projects to be done in a better way??

Please share your views...

 
 Refer 537
Share
 
 
  Rate : 
 
 
 
 
  3 1 1 1 0
 
 
 
 
 
 
 
 
 
 
 
 
 
1 2 3 4 5
1 Shock absorber
2 Access to better resources
3 Quality = Time & Cost
4 Change attitude towards Owner -Vendor Contrcator or Consultants realationship
5 Better flow of communication
6 Experts should deploy

Shock absorber

idea posted by Mohammad Bakhsh Project Leader/Managing Consultant, Freelancer

The building construction project or any project should be completed  on time and as per specification.The time is sacrosanct and specification the object.The schedule is the HDL or good cholesterol.These three together produce the conceptual plan into real physical object.The collaboration now a days has become necessity rather than the norm.It supplements one to the other and lines up the system to deal with and iron out obstacle on way to  construction activities.It provides flexibility and space absorb and under stand minor or major hold ups.The quality is ensured and the period of gestation is achieved.

3
1
  

I don't know how construction projects are managed in India, but it's been my experience in several other countries that, whereas the accuracy of the plans and specifications, the take-offs and estimates, and the budget are all of critical importance...and whereas architects, engineers, project managers and construction managers all have their place in the overall scheme of any project...it is the Site Supervisor or Project Superintendent who really makes or breaks both the schedule and the budget.  And the best of these are individuals with plenty of hands-on experience and maturity rather than the degree'd and credential'd types being cranked out by the universities these days who wouldn't know how to figure out an hypotenuse without the aid of their laptop.  They are the "Master Sargents" of the construction industry and the good ones absolutely essential to the success of any project.

1
  

In construction projects ,there are many things need to be sorted out at site itself and if  remain unattended ,the project may not proceed as per schedule.The collaboration helps in iron out the things and bumps are therefore taken care of.

Add your argument:

Access to better resources

idea posted by Ajay Kashyap Project Manager, Polaris Software

Collaboration brings about mixture of knowledge & talents for both the companies. Both companies can access to the talent pool & pick the best men for the job. Thus, the project gets an boost & gets done with a superior quality.

1
0
  

I support for this idea.

0
  

As the owner or general contractor of a construction project one finds oneself, by necessity, in "collaborative" relationships from start to finish.  The question is whether these are de facto associations or simple cases of teamwork OR formal partnerships.  In either case, one should always strive for relationships that only enhance the objective of the project and/or the mission of the company.

Whether one is "shopping" financing, interviewing architects and engineers, evaluating subcontractors and suppliers OR considering entering into a joint venture or partnership for the purposes of the respective project, one must remain focused on the objective/mission.  In other words, who can provide access to the better resources...and even who can provide better access to the essential resources?

Of course, as with so many other things in life, determining the "better" option is not always as simple as it first appears.  There may be a wide variety of intervening variables, not only "up-sides" but "down-sides", to the different options.

In the case of the de facto associations and opportunities for teamwork, one for sure must implement a "pro vs con" evaluation, that is, a risk analysis, where the bottom-line IS the bottom line.  However, in the case of considering a joint venture or partnership where the relationship is likely to be more highly integrated and binding, the bottom-line really becomes whether the other party is absolutely essential to the success of the project OR can one, in fact, effectuate the project successfully on one's own.           

Add your argument:

Quality = Time & Cost

idea posted by D.R.Balakrishna Planning Engineer, Overseas AST LLC ( UAE )

Quality indeed is enhanced to a great deal.Infact JV's have been a big success in the GCC.One's weakness is converted with the others strength.Civil Engg.projects in particular, prone to disputes needs a good & transparent JV aggrement,bad quality,is compromising Time & Cost. & without these two,project is a failure.

1
No supporting Arguments for this idea
Add your argument:

Change attitude towards Owner -Vendor Contrcator or Consultants realationship

idea posted by Prashanta Bhaumik Head/VP/GM-Tech. Support, ASPIRTEK Technology Ltd

All collaborations effectiveness is measured thru EQ( Emotional Quotient) between parties. Most of the Owner feels These outsiders Vendor,Contractor and other associates are to be squeezed for increasing profit. EQ comes down with this distrust from the start. When EQ is high between stakeholder  all sorts of Communication Gaps, Loyality, skilled labour/employees or performance etc comes into play for failure of collaboration. Call them as Business Colleauges as you introduce your own employee instead Vendor or Contractor.

Better Emotuonal Bonding= Better Collaboration True in all kinds of Projects

1
0
  

Well said Sir. Emotional bond should develop first. Heigher the EQ in all the parties, greater the chanaces reduction of gap in communication which shall lead to better collabrations. After all, we are all human beings first. 

Action orientation is all the more required by all the memebers to  achieve the objectives. 

Add your argument:

Better flow of communication

idea posted by Pragya Kothari Construction-Heavy, DLF

A collaboration b/w two companies ensures that there is no communication gap & no mistakes are done in the delivery of the messages. Further collaboration may bring about the mixing of technologies which may further speed up the process of communication.

Thus, better communication helps in proper implementation of instruction & severe mistakes are avoided.

0
No supporting Arguments for this idea
Add your argument:

Experts should deploy

idea posted by Johnson Joseph D'souza Construction-Specialty, Raicon Engineers

hello friends i want to wish better days for constuction industry.nowdays the project cant be handle with one agency bcoz traditional connstruction is getting laps,so advance technologies can be hire from "masters from that field" so better & monuumatric design we should collabrate so many agencies,contractors experts,tech personnel.

0
No supporting Arguments for this idea
Add your argument:

Add your Idea
Idea* : 
Add your argument:
edit in rich text ...
Could not find any idea interesting in: "How construction collaboration helps projects?" ? Click here to add a new idea...

Found the idea contest "How construction collaboration helps projects?"  interesting ?  Click here to refer to your connections and communities
 
Viewers also viewed
I always add a query on my mind that when we consider the effectiveness in understanding and...
 
1 referals 22 arguments, 1385 views
Is it really important that construction organization to have PMP certification, but then...
 
4 referals 35 arguments, 1916 views
Knowledge Management (KM)  is a field which deals with knowledge identification, capturing,...
 
37 referals 8 arguments, 339 views
more...  
Recent Knowledge (15)
A Pakistani lawmaker has said that terrorist outfits in Khyber-Pakhtunkhwa province are...
 
1281 referals 13 votes, 196 views
Please give out every possible logical and rational idea which is practical in present context.
 
81 referals 5 votes, 110 views
The question is simple. What makes you smile? Let us stop fighting on various topics and discuss...
 
1697 referals 27 votes, 361 views
more...  
More From Author
I have always believed that we should think on 10-15-20 years from now basis. The infrastrucute we create can last longer than it does. This will always need lot of extra support but still won't it be helpful. Do you think the way we are planning...
Thanks for comments :) I have not written this poem I found it in a friend's blog and thought of sharing it ..
A little poem on corruption i found it somewhere.. Ek civil engineer ne ek bridge banaya.. Contractor tha uska contract laaya.. Jab adalat ne bridge par mukadma chalaya.. Bridge ghabraya.. Usne rote rote bataya.. Mene concrete aur cement nahi...