| Topic : How to prevent mishaps at Construction Sites? |
|
|
Construction Planning & Management
|
|
Activity:
98 views;
last activity : 07 06 2010 20:18:09 +0000
|
|
|
|
1
Qualty Management in Concrete Construction
2
Lean method
3
Reliability directly related to quality
4
quality management in concrete construction can be done through the controll over consumption of material and random sample
|
|||||||||||||||||||
|
|
In most industries, the concept of quality management is age old and used extensively. We must implement this method in construction industry also. |
2
|
In construction industry,most of the renowned contracting agencies and especially those with ISO certification have the company's Quality Policy and Quality Objectives signed by the Managing Director.Also,the contract specification on workmanship and material lays down criteria to evaluate qualitative performance /confirmance.It is ,therfore, mandatory on the part of contractor to satisfy the Client/PMC on the quality System by establishing a field testing facility manned by the QA/QC Manager ,engineer and lab.technicians specifically deployed at site by the contractor in compliance of the contract provision under contractual obligation/responsibility.It is only a question of orderly implimentation of quality confirmance procedure and proper monitoring & control by client/PMC/contractor which if not done would invite trouble in the form of penal provisions in the contract.The contracting agency will have to tighten their belt in ensuring a proper level of quality confirmance through introduction and implimentation of Quality Management System.
The only problem is that you probably met the wrong kind of people.
|
|
One method for quality management in the construction industry can be the Lean technology which ensures the quality of the work is maintained with a proper review system. |
1
|
Dear Pragya,will you please elaborate on the "Lean Technology'and how it ensures quality confirmance through implimentation.
|
|
If there is no quality there is no reliability. Without reliability no firm can stand for long run |
0
|
quality management in concrete construction can be done through the controll over consumption of material and random sample
|
|
Qualitye management in concret can be controlled through controll over raw material consumption or at batching plant from where the material is prepared , Create awarness in junior level supervisors / formen because while placing if proper compaction is not done it , time to time quality tests and by virtue of experience by simply visulising one can acess about the quality.Before and after placing concrete the form work should be checked for plumb and line . |
0
|

- Create a confidential Career Profile and Resume/C.V. online
- Get advice for planning their career and for marketing of experience and skills
- Maximize awareness of and access to the best career opportunities
|
|
|
|
|
|
I agree that corruption is the root cause of all problems or failures. With the arrival of computer and modern technology, sufficient information regarding design parameters, construction methodology, suitable materials etc. are available; but who is... |
To: Hiring Managers, I am a seasoned professional Civil Engineer with advanced Professional degree (1986) and M.S.(1980) degree in Civil Engineering from Columbia University, NY. In 1973, I obtained B.Sc. (Civil Engg.) degree from the Institute... |
In my opinion, most of us do not try to understand the inner meaning of life, so we are always confused, for which we mess up our lives. Men and women ,both are creations of God, and each has a unique position in life. We must understand the external... |