Build your professional network on facebook via our app Go to app
jaivir singh duddi Civil Engineer-Other, punjab engineering college chandigarh
 
Create knowledge [?]
 
(rate this)
give most favorite topics 
2
VS
0
 take all the structural members
Pragya Kothari  |  Argues in support of  "give most favorite topics"  |  3 years ago
Dear Jaivir, did you search www.mbaarticles.com and www.spss.com ? I am sure you will get a lot of interesting articles there in your field....
 support: 
 
 
Debate: "please, help me for the new industry topics on structure for my thesis........" deleted from your view.
Undo
 
(rate this)
Test in Indian Codition is needed 
4
VS
1
 Test in Indian Codition is not needed
Vivek Singh  |  Argues in support of  "Test in Indian Codition is not needed"  |  2 years ago
Not necessary. The tests are conducted in laboratory controlled conditions and will be done in the same manner in India also. The pull out test, which gives the real (in-field) strength and efficiency of geogrids, is already done either at site...
jaivir singh duddi  |  Argues in support of  "Test in Indian Codition is needed"  |  3 years ago
the tests for geogrid material is needed in India........for better and fruitful results,.....
puru kumar  |  Argues in support of  "Test in Indian Codition is needed"  |  3 years ago
Due to Environmental Temperature difference in India and Europian country, it should be conducted for Indian condition as it is being used in India.
 support: 
 
 
Debate: " Laboratory Tests for Geogrid materials (used in RE wall constructions) is necessary for Indian condition tests" deleted from your view.
Undo
 
(rate this)
Planning 
98
VS
66
 Execution
anuradha  |  Argues in support of  "Planning"  |  1 year ago
Without planning execution is not possible and not viz-a-viz. if planning is done correctly/minutely its executive definately brings result.
jaivir singh duddi  |  Argues in support of  |  3 years ago
planning is main phase for any type of project.......
M NITIN SHENOY, PMP, IPMA-D, CEng MICE  |  Argues in support of  "Planning"  |  3 years ago
If your OBJECTIVE is to JUST COMPLETE the project then EXECUTION alone is ENOUGH ! But if you would like to COMPLETE the Project within SET CONSTRAINTS to MEET/ACHIEVE all SUCCESS CRITERIA for a PROJECT SUCCESS then GOOD PLANNING is a MUST PRIOR...
 support: 
 
 
Debate: "Planning v/s execution" deleted from your view.
Undo
 
(rate this)
explain broadly........
CHIRAYU  |  Answered  |  1 month ago
As black cotton soil is a soil having a poor properties which are sticky and also if the construction work will be carried in such soil there will the problem of swell shrik. So in such type of soil condition the deep foundation must be taken for...
somashekkhar  |  Answered  |  1 year ago
Somashekhar R Engineer and consultant  Hadagali bellary in black cotton soil , excavate to the depth of 1.5 mts and see the strata what will be the sbc if its of 7 to 8 t/sqc than fill itwith sand and boulder for the depth of 0.45 mts, after...
Pragya Kothari  |  Answered  |  3 years ago
First the the type of expansive soil like black cotton should be modified by chemical admixtures, which is a common method for stabilizing the swell shrink tendency of expansive soils.  The advantages of chemical stabilization are that they...
 
 
Answer: "what are the foundation for the black cotton soil?" deleted from your view.
Undo
Follow me on
TooStep
 
 
Contributions and Connections
 
 
111 Contribution Points
0
0 Expert Badges
[?]
8
Connections
12
Following
2
Followers
[?]