kartik vinodbhai trivedi's Profile
kartik vinodbhai trivedi's Experience
| Current : |
Project Manager, Cifex world |
|
| Oil & Gas | ||
| India | ||
| Previous : |
Trading Co.LLC |
|
Worked from 2009 to 2011 | ||
Brief summary :
Manager -Projects and Engineering Hasan Juma Backar Contracting and Trading Co.LLC,Oman Dec.2009-April.2011 Design Review and Drawings Approvals(Piping and Pumping stations Project of Oman Government) Engineering and procurement of material and Installation and commissioning of Pumps Sub contractor selection and subcontract awards Electrical control panels and Scada system Budgeting and Resources planning Project Tracking and Monitoring Interaction with consultants and Clients Manager-Projects(Oil and Gas Division) | ||
| Previous : |
Cifex World Libya |
|
Worked from 2008 to 2009 | ||
Brief summary :
Cifex World, Libya Nov.2008 - Nov.2009 EPC project ( Oil and Gas) Project at Benghazi(Libya) Design Review and Drawing Approval for civil work - Raft foundation,columns,beams,slabs Equipment selection review and Procurement Electrical design review and drawing approval Electrical equipment and material procurement, installation and commissioning Piping design review and drawing approval.Procurement,installation and commissioning Pumps,compressors.valves,Pipings,tanks material procurement(Selection, Evaluation of Bid, Datasheet Approval and Procurement)installation and commissioning Fire Fighting design review and drawing approval. Fire Fighting equipment selection and material procurement, installation and commissioning Metering skids,MOVS,Analyzers,Fire and Gas detection systems HVAC - Design and drgs.approval,AHU,Chillers,FCU,Pumps,Boiler approval and procurement Ducting and plumbing - design and drg.approval,procurement,installation and commissioning Project Manager | ||
| Previous : |
Qatar Construction And EnggCo RLIC Doha Qatar |
|
Worked from 2007 to 2008 | ||
Brief summary :
Qatar Construction and Engg.Co. RLIC, Doha, Qatar Sept. 2007 - Nov. 2008 Steering entire project management activities covering project planning, Engineering, Procurement, project scheduling, resource management and cross functional coordination under mechanical, civil and electrical domains. Selection of equipments, review of Datasheet, technical Bid evaluation(Static and Rotating equipments) Project implemented: Common low sulphur storage and export facilities (312 Million US Dollars) The project scope covered Engineering, Procurement ,Construction,(installation, commissioning, testing and operation) of the following works; Mechanical: Condensate loading pumps, booster pumps, fire pumps, Pipings-c.s/cu-ni/grp valves, condensate storage tanks, fire water tank, form tank civil: Foundation for tanks, underground pipings, ITR/sub station buildings, Site preparation, offices and Lay down area , pipe rack Instrumentation: Metering skid, MOVS, Instrument cables, Analyzers, Fire and gas Detection system Electrical : Substations, Cable laying, DCs modification, lighting installation Construction Manager | ||
| Previous : |
Saudi Bin Laden Group PCM Division |
|
Worked from 2006 to 2007 | ||
Brief summary :
Saudi Bin Laden Group(PCM Division) Feb. 2006-Aug. 2007 Contributed techno-managerial inputs in fabrication, installation, commissioning of mechanical, electrical and civil jobs at Yanbu National Petrochemical Ltd.(Fluor/Foster Wheeler Project) Civil Foundations for the pipe racks,pumps,plate exchangers Culverts for the Road Crossing Fabrication of shop pipes and pipe supports Shot blasting and painting of pipes and supports Pipe Erection (Under ground. Above ground, on rake) CS/SS/FRP pipes Pumps, erection, and alignment Erection of plate exchangers and Sub stations General Manager | ||
| Previous : |
Contractors , |
|
| Ahmedabad | ||
Worked from 1993 to 2006 | ||
Brief summary :
Triveni Engineers and Contractors, Ahmedabad 1993 -2006 Entrusted with final responsibility for planning and execution of projects within defined cost and timelines. Provided strategic inputs in the areas of -project planning, designing, scheduling, mapping materials requirements, procurement, budgeting, resource mobilization and management, Analyzed scope of project and structured Project bids covering all technical and commercial aspects. Attended techno-commercial discussions to facilitate finalization of work contracts. Engaged qualified and experienced sub contractors and monitored their work performance within agreed project terms. Provided technical guidelines / clarifications to ensure bottleneck free work execution. Approved project design and drawings. Laid out and enforced quality management systems to ensure conformance to defined quality parameters. Coordinated with all involved agencies- client, consultants, subcontractors, site engineers etc to iron out any ambiguities and catalyze project execution. Various project works executed included- Erection of piping/valves/ fitting, Erection of static and rotating equipments, Pipe fabrication and erection and AC Plant erection and maintenance Asstt Project Manager | ||
| Previous : |
Voltas Ltd. |
|
| Ahmedabad | ||
Worked from 1988 to 1992 | ||
Brief summary :
Voltas Ltd. Ahmedabad 1988- 1992 Successfully executed HVAC projects providing techno-managerial inputs. The works executed covered - Supply erection and commissioning of AHU/FCU/ Condensers Pumps/ Piping HVAC Projects-complete construction and commissioning Dy. Project Manager | ||
| Previous : |
Kirloskar Pumps Ltd. |
|
| Ahmedabad | ||
Worked from 1983 to 1988 | ||
Brief summary :
Kirloskar Pumps Ltd. Ahmedabad 1983 -1988 Structured EPC Project Bids and attended techno-commercial negotiations to finalize work contracts. Successfully implemented erection, commissioning, testing, operation and maintenance of Pumps/ Valves/Electrical Motors/piping/ electrical cables/ substations etc. Secured Design and Drawing approvals and clarified technical/ allied project issues to speed up work progress. Mapped materials needs and maintained reasonable inventory of all inputs to feed project / maintenance requirements. Planned and managed shut down maintenance. Maintained perfect coordination with Consultants/ Clients and ensured hasslefree work execution. Effectively handled Routine and preventive maintenance of equipments (pumps/valves/motors/ mech seals/bfw pumps/boilers) to maximize operational availability thereof. Accomplished projects of installation and commissioning of Heat exchangers/reformers/ Scrubbers/cooling towers within agreed time and cost parameters. | ||
Sponsored Jobs
Featured Career Adviser
IT Service and Staffing company
- Create a confidential Career Profile and Resume/C.V. online
- Get advice for planning their career and for marketing of experience and skills
- Maximize awareness of and access to the best career opportunities
kartik's communities
|
25984 members, 211 jobs, 568 articles, 570 questions, 621 debates, 368 idea contests.
|
Related Topics
Within the Project Life Cycle, unforeseen issues often arise that result in...
2 insight
, 1 debates
, 5 idea contests
, 9 question
For a company that works on projects, how is project management different...
1 insight
, 2 debates
, 2 question
Discuss the causes of success and failure for BPR implementation & also...
2 insight
, 3 debates
, 1 idea contests
Viewers also viewed
|
(202 Points)
|