Rudrabhatla Srinivasa rao  |  Answered  |  2 years ago
Most of the topics are covered but one thing i would like specify in here is the consistency of the contractors to complete the job in time safely and with desired quality standards. Most of the time contractors boast / show a good amount of...
Mohammad Bakhsh  |  Answered  |  2 years ago
The good contractor is a contractor whose credentials are sound.References, Record of execution of similar works,Establishment, Holding of Plant and machinery,The existing work load,,Record of earning authenticated by his Charted Accountant.These...
 
 
Answer: "HOW TO FIND THE GOOD CONTRCTORS, HOW TO EVALUTE THE CONTRACTORS. WHAT ARE THE FACTORS EFFECT ?" deleted from your view.
Undo
 
(rate this)
As per level sheet, the excavated qty is 100 Cum, same earth will be carting away of 3 km distance, (Since the Carting away is not included in excavation specification, or item) for that how much qty...
ajay  |  Answered  |  1 year ago
I have to do pedestal of 1mtr by 1mtr.So what will be excavation size as per is1200 code.
ajay  |  Answered  |  1 year ago
if have to do pedestal of 1mtr by 1mtr.then excavation of it is counted on what?
 
 
Answer: "What is the mode of Measurement of Excavated earth Qty and Carting away Qty, " deleted from your view.
Undo
 
(rate this)
GENERAL EXCAVATION General excavation by mechanical means, in all types of soil, with necessary manual excavation for dressing the edges and leveling with all lead and lift, carting away the excavate...
mankari Zameer  |  Answered  |  3 years ago
General Excavation can be carried out without any obstruction as it is being a open portion or bulk excavation resulting more output hence the rate shal be less. Where as, in case of trenches, there will be limitations to proceed the work such as...
Er. Harnam Singh  |  Answered  |  3 years ago
No rates have been given for both the items so no comparison. if both the items are carried manually Earthwork(EW) in trenches will be costlier that general EW becuase in treches working area is ristricted and in general excavation working area...
 
 
Answer: "Why the Rate Difference between General Excavation and Excavation in Trenches, What are the factors effecting" deleted from your view.
Undo
 
(rate this)
General Excavation 
1
VS
4
 Excavation in Trenches
Pragya Kothari  |  Argues in support of  "Excavation in Trenches"  |  3 years ago
I agree with Mr. Bhavesh Kumar. General Excavation is not an intelligent option to prefer...
Charles davison  |  Argues in support of  "General Excavation"  |  3 years ago
I am not supporting anything here just explanation Gen excavation is formation on huge area with grader etc . trench excavation is within some confined space with trimming etc., trench excavation is costly due to the nature of the activity hence...
Bhavesh Kumar  |  Argues in support of  "Excavation in Trenches"  |  3 years ago
Genaral excavation is NOT preferable. If general excavation is done even if not required as per foundation design,the earth filling will be required for the area under floor till the actual excavated depth which will never give the strength at...
 support: 
 
 
Debate: "General Excavation Vs Excavation in trenches in the building" deleted from your view.
Undo
 
(rate this)
Project Schedule + Cash flow statement  
3
VS
0
 S- Curve
Mallaya Pandravada  |  Argues in support of  "Project Schedule + Cash flow statement "  |  3 years ago
Dear friend , The cash flow we have drawn from the estimated amounts spent on each of the activity according to Main Construction Program. The expenditure on the particular activity is interspersed equally on following assumptions. There are...
Jyoti Rath  |  Argues in support of  "Project Schedule + Cash flow statement "  |  3 years ago
Mr Mallaya is right.The project schedule and S curve are inseparable and interrelated.
 support: 
 
 
Debate: "Project Schedule = Cash flow statement = S Curve, In Practical can we maintain Real S Graph" deleted from your view.
Undo
 
(rate this)
QUANTITY SURVEYOR (SMART WORKER) 
11
VS
22
 PROJECT MANAGER (HARD WORKER)
Zartash Afzal  |  Argues in support of  "QUANTITY SURVEYOR (SMART WORKER)"  |  3 months ago
Quantity Surveyors are able to manage all the site and also done his work also but Project Manager only manage the site and he is not able to properly work as a Quantity Surveyor so Quantity Surveyors Better then Project Manager
jps kumar  |  Argues in support of  "PROJECT MANAGER (HARD WORKER)"  |  3 years ago
I support Yogendra,there is no comparision between a projct manager to a quantity surveyor.
Yogendra Singh Chauhan  |  Argues in support of  "PROJECT MANAGER (HARD WORKER)"  |  3 years ago
Project Manager and Quantity Surveyor ----- No Comparision..... Project Manager is leader and Quantity Surveyor is support staff ..... Quantity Surveyor compiles the data in accordance with specifications, drawings and contract..... Quantity...
 support: 
 
 
Debate: "Quantity Surveyor Vs Project Manager" deleted from your view.
Undo
 
(rate this)
kota siva rama prasad  |  Answered  |  3 years ago
SAP IS VERY MUCH USEFUL IN CONSTRUCTION INDUSTRY, WHERE AS IN OUR ORGANAIZATION WE ARE USING SAP, SAP IS THE MEASURING DEVICE OF ACCURACY, YOU CAN FIND IN SINGLE LINE, IS ESTIMATED COST, CONSTRUCTION COST, UNDER EACH SEPARATE HEAD.
Yusuf Lateef  |  Answered  |  3 years ago
If i understand what you mean by SAP !, Structural Adjustment Programme, SAP will make the Government look inward for indigenous Civil Engineering proffessionals to carry out civil engineering designs, procurement and construction, this will...
 
 
Answer: " How SAP is usefull for the profesion of civil ENGR?" deleted from your view.
Undo
 
(rate this)
Mangala Shetty  |  Answered  |  3 years ago
U r right vivek sir, Both are same , its just playing with words.
kota siva rama prasad  |  Answered  |  3 years ago
NICE ANSWER,
 
 
Answer: "What is difference between FSI (Floor Space Index) and FAR (Floor Area Ratio) ?" deleted from your view.
Undo
 
(rate this)
Yes 
11
VS
4
 No
Mohammad Bakhsh  |  Argues in support of  "No"  |  7 months ago
It is neccessary to know the financial implications of a proposed work.The preliminary estimate is generally prepared on thumbrule for building works and for roads per kilometer.This is purely for obtaining administrative approval or for budgeting.
Abhik Dasgupta  |  Argues in support of  "Yes"  |  7 months ago
Thumb rules evolves only after laborious calculations and research work has been done, though we are practically expected to keep data in our tips in our everyday life
javed iqbal  |  Argues in support of  "Yes"  |  3 years ago
I fully agree with George, it all depend on the requirement, if we want to know the exact cost / budget than we have to go for in depth calculation and that time merly thumb rule will not work out. Thumb rule is required at the initial stage of...
 support: 
 
 
Debate: "Thumb rules for caluculating the cost per sqft will work out or not" deleted from your view.
Undo
 
(rate this)
1) I WOULD LIKE TO KNOW IF BUILT UP AREA   IS REDUCED, CONSTRUCTION COST WILL BE INCREASED OR NOT ?  2)WHAT ARE THE THUMBRULES FOR FINDING OUT THE CONSTRUCTION COST OF  G+13 APARTMETNS, BUILT UP AREA...
 
 
Answer: "BUILT UP AREA vs CONSTRUCTION COST PER SQFT, WHAT ARE THE THUMB RULES FOR FINDING OUT THE CONSTRUCTION COST PER SQFT" deleted from your view.