| Current : |
Senior Project Manager MEP, Mace International |
|
| Construction | ||
| United Arab Emirates, Dubai | ||
Working from 2005 | ||
|
Brief summary :
Here I worked at the project management of Mall of Emirates Core and shell with 47 MW of cooling and 98 MW of electrical load. Voltas were the MEP contractors for the Mall and ETA were the contractors on the Energy Centre.This project gave me full confidence in project managing any other job. I was reporting to Paul Priddy the senior project manager who took notice of my capabilities and recommended to the Mace Management for me to handle on my own the next project Mirdif City Centre a 2.6 billion dirham project for Majid AlFuttaim project. At Mirdif City Centre the job was challenging as I was the senior project manager on the complete MEP and directly reporting to the project director Mark Kennedy. Cooling load is 53 MW and electrical load is 113 MW. ETA are the MEP Contractors on the project. | ||
| Previous : |
Project Manager Mechanical, Real Estate Investment Services Company |
|
| Construction | ||
| United Arab Emirates, Abudhabi | ||
Worked from 2003 to 2005 | ||
|
Brief summary :
Here I reviewed the design of 1 billion dirham project named Capital Plaza comprising of 5 towers (2 residential towers,2 office towers and 1 hotel tower 47 floors) with common podium and 5 level basement carpark.The mep consultants were from Singapore named Meinhardt. | ||
| Previous : |
Senior Project Engineer, Parsons Brickerhoff |
|
| Construction | ||
| United Arab Emirates, Dubai | ||
Worked from 1999 to 2003 | ||
|
Brief summary :
In this job I was exposed to the design and construction of shopping malls. I worked on 3 shopping malls for the client Majid Al Futtaim and were a huge success. | ||
| Previous : |
Senior Mechanical Engineer, W S Atkins |
|
| Construction | ||
| United Arab Emirates, Dubai | ||
Worked from 1994 to 1999 | ||
|
Brief summary :
This job exposed me to the nitigrities of the HVAC design,Plumbing & firefighting design of 26 storey 600 room Jumeirah Beach Hotel and other ancillary facilities. I worked under Steve Philips design manager the most learned and simple person that i have come across till date. | ||
| Previous : |
Senior Project Engineer, ETA |
|
| Construction | ||
| United Arab Emirates, Dubai | ||
Worked from 1992 to 1994 | ||
|
Brief summary :
This was my first overseas job and was exposed to fast track work.I managed HVAC works for Le Meridien Jumeirah Hotel (242 room hotel facing the sea) and 42 warehouses for Oil Field Supplies Limited in JAFZA. Through my dedication and hard work earned the confidence of the Jordanian Consultant Mr Nader Abdul Latif and my colleagues. | ||
| Previous : |
Senior Erection Engineer, Blue Star |
|
| Construction | ||
| India, Secunderabad | ||
Worked from 1990 to 1992 | ||
|
Brief summary :
It was a good experience working with the then industry stalwarts such as Jambunathan,Prakash Rao, Sivashankaran,shankaran,Mukund Menon,Rajagopal,Madhavan and now Anand Kumar southern regional manager now. I managed the HVAC works at hotel green park,shanbhagh hotel and NTPC ramagundam.I got good support from my superiors based on which I could manage myself well overseas. | ||
| Previous : |
Senior Project Engineer, Utility Engineers |
|
| Construction | ||
| India, Chennai | ||
Worked from 1986 to 1990 | ||
|
Brief summary :
This is were I started my career and learnt the industry standards from pioneers in the AIRCONDITIONING field such as UnnyKrishnan,Rajagopal,Kandeepan,Ramanathan,Chandrasekhar etc. I managed the HVAC works at ITDC hotel in Pondichery,Apollo Hospitals in chennai,TVS group Chennai and successfully tendered and booked the Indian Oil Corporation job. | ||
United Staes Green Building Council |
|
| LEED AP | |
| United States | |
| From 2008 to 2008 | |
|
Brief summary :
Attended USGBC LEED AP exams in 2008 and successfully passed it with 86%. | |
University Visvesvaraya College Of Engg., Bangalore |
|
| B.Tech/B.E. | |
| India | |
| From 1980 to 1985 | |
|
Brief summary :
I did my Mechanical Engineering Degree at UVCE with electives of Airconditiong and Refrigeration | |

- Create a confidential Career Profile and Resume/C.V. online
- Get advice for planning their career and for marketing of experience and skills
- Maximize awareness of and access to the best career opportunities
|
10205 members, 379 jobs, 894 articles, 282 questions, 934 debates, 319 idea contests.
|
|
22053 members, 610 jobs, 812 articles, 392 questions, 599 debates, 256 idea contests.
|
|
25980 members, 211 jobs, 568 articles, 570 questions, 621 debates, 368 idea contests.
|
It is 28 years since we won the world cup.Therefore as a team we should win for the nation. |
Yes with the likes of Sachin Ramesh Tendulkar,Viru,Gambhir yyyyyyyy not.It will be dream come true for Krishnamachari Srikanth after 28 years.Good luck to the boys. |
No chance at all. |
there are many ways the owner could promote his Mall during the opening ceremony as below. 1.Offer 25% discount for the first 100 customers. 2.Offer 100% retrun of the bill amount for every 101st customer upto a max value of Rs 5000. 3.Offer two movie... |
|
|
Parthasarathy Ramesh, Senior Project Manager MEP, Mace International
|
|
|
Parthasarathy Ramesh, Senior Project Manager MEP, Mace International
|
|
(53 Points)
|
|
(106 Points)
|
|
5
(1,911 Points)
|





