Prabhat Behera's Profile
Prabhat Behera's Experience
| Current : |
Sr. Reliability Engineer, Qatar Ltd. |
|
Working from 2007 | ||
Brief summary :
Sr. Reliability Engineer (Instrumentation and Control Systems) Occidental Petroleum of Qatar Ltd., Qatar Aug2007 - Present Eliminated five major repeat failures. Realised several production assurance opportunities and achieved improved uptime. Developed work program to prevent pre-mature failures. Provide advice and administer lesson learned in reliability and maintenance areas of the equipment to support the asset team in both day-to-day operation and the offshore facilities related projects. Produced Asset Reliability Performance Report (ARPR) to monitor the reliability status of the equipments in Oil Separation, Gas Compression, Water Injection, and Power Generation categories. Established guidelines for run and maintain stage with disaster recovery plans. Launched a software library with back-ups, application and system software. Accountable for management of change (MOC) and annual maintenance contracts (AMC). Sr. Control and Automation Engineer Shell, Asia Pacific (BU: | ||
| Current : |
Head of Instrumentation & Control Systems, Occidental Petroleum |
|
| Oil & Gas | ||
| India, Bhubaneswar | ||
| Previous : |
SSB/ SSPC |
|
Worked from 2005 to 2007 | ||
Brief summary :
SSB/ SSPC) May2005 - Aug2007 Implemented the smart field foundation projects. Developed Project Execution Plans (PEP), Functional Test Plans, HES Plans, Work Method Statements, Maintenance Procedures, Service Level Agreements (SLA), and Operating Instructions. Control Systems Coordinator | ||
| Previous : |
Qatar Vinyl Company Ltd. |
|
Worked from 2000 to 2005 | ||
Brief summary :
Qatar Vinyl Company Ltd., Qatar Oct2000 - May2005 Accomplished flawless start-up of the Qatar Vinyl Petrochemicals Plant, a joint venture between Totalfina, Norsk Hydro and Qatar Petroleum. Attained satisfactory operation of Basic Plant Control System (BPCS), Plant Historian (PIMS) and Emergency Shutdown System (ESD). Project Engineer (Instrumentation and Control Systems) | ||
| Previous : |
n Petrochemicals Corporation Ltd. |
|
| India | ||
Worked from 1995 to 2000 | ||
Brief summary :
Indian Petrochemicals Corporation Ltd., India Sep1995 - Oct2000 Worked on the engineering, commissioning and start-up of a USD 1.0 Billion Petrochemicals complex. Successfully managed the spare parts inventory and set the optimum stock levels. | ||
Prabhat Behera's Education
Curtin Business School |
|
| MBA/PGDM | |
| Australia | |
| From 2005 to 2009 | |
|
Brief summary :
Executive MBA with 72% score | |
VSS University of Technology, Orissa |
|
| B.Tech/B.E. | |
| India | |
| From 1991 to 1995 | |
|
Brief summary :
Electronics & Telecommunication Engineering | |
Sponsored Jobs
Featured Career Adviser

Nefer HR
- Send your profile to web@nhrms.com
- Advisory services for searching for right job call us on +91 9949145000.
- Sectors - IT, ITeS, Pharma & Non IT
Prabhat's communities
|
28197 members, 168 jobs, 221 articles, 263 questions, 420 debates, 181 idea contests.
|
|
7261 members, 156 jobs, 187 articles, 128 questions, 252 debates, 133 idea contests.
|
Prabhat's
contributions
I think the prices must be determined by MARKET, not Government. The subsidy era must come to an END and let if float free. Otherwise, we suffer in one way or th eother. |
The close-out must be aimed to exceed end-user satisfaction. I've seen the strategy to get buy-in from clients at the initiation stage helps to achieve a smooth close-out. However, this is quite difficult and most project management personnel miss to... |
Related Topics
1 insight
, 1 debates
, 1 question
1 insight
, 1 debates
Viewers also viewed
|
5
(1,911 Points)
|
|
4
(2,405 Points)
|
|
4
(1,124 Points)
|





