Question posted: 05 01 2009 06:28:09 +0000,
0 answers, 1142 views, last activity
07 06 2010 20:18:08 +0000
|
|
|
|
1) I WOULD LIKE TO KNOW IF BUILT UP AREA IS REDUCED, CONSTRUCTION COST WILL BE INCREASED OR NOT ?
2)WHAT ARE THE THUMBRULES FOR FINDING OUT THE CONSTRUCTION COST OF
G+13 APARTMETNS, BUILT UP AREA COMES 1 LACK SQFT
VETRIFIED TILES IN BED ROOMS & HALL, CERAMIC IN KITCHEN & TOILETS, 88 APARTMETNS, 4LIFTS, 2SUMP, 1 BASEMENT, 3 TOWERS, SWIMMING POOL, CLUB HOUSE, CHILDREDN PLAY AREA, FLUSH DOORS, 2 TRACK ALLUMINIUM WINDOWS WITH 10MM WINDOW GRILL , 2M EXCAVATION WORK, 8" BLOCK MASONRY OUTER WALL, 6" INTERNAL WALL, INTERNAL 12MM PLASTERING, 20MM WATERPROOFING FOR EXTERNAL WALL, EMULSION FOR INTERNAL & CEILING WALL, EXTERNAL WEATHER SHIELD,COMMON AERA TEXTURED PAINT
A) EARTH WORK
B) P.C.C.
C) R.C.C.
D) REINFORCEMENT
E) FLOORING
F) WATER PROOFING
G) STRUCTURAL WORKS
E) DOORS & WINDOWS
F) MISC WORKS
G) MASONRY
H) PLASTERING
I) PAINTING

- Create a confidential Career Profile and Resume/C.V. online
- Get advice for planning their career and for marketing of experience and skills
- Maximize awareness of and access to the best career opportunities
|
|
|
|
|
|
|
|
|
|
HOW TO FIND THE GOOD CONTRCTORS, HOW TO EVALUTE THE CONTRACTORS. WHAT ARE THE FACTORS EFFECT ? |
What is the mode of Measurement of Excavated earth Qty and Carting away Qty, |
Why the Rate Difference between General Excavation and Excavation in Trenches, What are the factors effecting |