| Topic : Heavy/highway construction |
|
|
Posted in Community :
Construction Planning & Management |
construction engineers |
Civil Engineers |
2 more ...|
|
Activity:
Question posted: 05 20 2009 04:52:12 +0000,
3 answers, 168 views, last activity
07 06 2010 20:18:08 +0000
|
|
The fifth revision of Ministry of Road Transport & Highway's technical specification is on cards. If you are in touch then please suggest the changes you would like to see in the new revision.
Prev1NextShowing 1 - 3 of 3
Answered by
Basab Ghosh, General Manager (Operations), Saipem India Project Ltd.
| 05 21 2009 11:01:05 +0000
1. The spec for bitumen concrete, it's preparation, laying and compaction.
2. Spec for surface wearing coat.
3. Spec for preparation of road geometry and adherence tolerances for profile & geometry.
4. Specification for road repairs - materials, execution methodology, adherence to original geometry and profile etc.
5. Requirements for cleaning up after the job every evening.
Prev1NextShowing 1 - 3 of 3
Found the question
"Change in Roads and Bridges Specs...What you want to change?"
interesting?
Refer to your connections and communities
Viewers also viewed
|
|
|
|
|
|
Unanswered Questions (63)
|
|
|
|
Sponsored Jobs
More From Author
Now this is a very small example. The total cost of abridge is nothing in front of common wealth amd 2G and similar things. ye to chhoti moti bate hain hoti hi rahti hain. |
I dont think this story just shows our attitude towards appreciation of art. It also shows the hypocracy attached to the appreciation of artistic works. Since nobody new the artist nobody cared. If he would have played same tunes with his usual fan &... |
Good humour...but better not be tried |