Build your professional network on facebook via our app Go to app
R. Construction-Construction Management, PT. TRUBA JAYA ENGINEERING
 
R.'s Profile
R.
Construction-Construction Management, PT. TRUBA JAYA ENGINEERING
PT. TRUBA JAYA ENGINEERING
confidential
confidential
Cilegon, Indonesia
Toostep 
Professional summary
R.'s Experience
Current :

Construction-Construction Management, PT. TRUBA JAYA ENGINEERING

Construction
Indonesia, Cilegon

Working from 2009

Brief summary :

  • PLANNING AND EXECUTION OF THE PROJECT. FROM PLANNING TO EXECUTION AND EXECUTION TO STAGE.
  • PLANNING AND MONITORING QUALITY REQUIREMENT OF THE WORK SITE WITH QA & QC
  • PLANNING AND MONITORING  THE SAFETY REQUIREMENT OF THE WORK SITE
  • ESTIMATION OF TECHNICAL REQUIREMENTS SUCH AS MANPOWER, EQUIPMENT, TOOLS AND CONSUMABLES ETC.
  • OPTIMIZATION OF EQUIPMENT USAGE AND PROPER MAINTENANCE OF EQUIPMENT
  • COORDINATION WITH CLIENT AND VENDORS FOR CONSTRUCTION PROGRESS

Previous :

Construction-Construction Management, PT. TRUBA JAYA ENGINEERING

Construction
Indonesia
Previous :

SITE MANAGER, 2 NOS. COMMISSIONED SUCCESSFULLY IN 190 MW COMBINED CYCLE POWER PLANT AT RANHILL POWERTRAN LTD

ALEXANDRIA

Worked from 2004 to 2007

Brief summary :

THERMAL POWER PLANT PROJECT INSTALLATION, COMMISSIONING CO-ORDINATION AND TECHNICAL SUPPORT FOR OPERATION and MAINTENANCE OF 43 MW COAL FIRED THERMAL POWER PLANT LEAD THE COMMISSIONING TEAM PREPARATION OF THE COMMISSIONING PROCEDURES, CHECK LISTS and COMMISSIONING SCHEDULES AND COMMISSIONED THE PLANT IN STIPULATED TIME. TECHNICAL SUPPORTS FOR COMMISSIONING OF NEW THERMAL POWER PLANTS. MAJOR ACHEVEMENTS: 43 MW COAL FIRED POWER PLANT SUCCESSFULLY COMISSIONED AND MCR OPERATION AND PLANT STABILIZATION ACHIEVED IN SHORT DURATION. 43 MW COAL FIRED POWER PLANT COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEM IMPLEMENTED SUCCESSFULLY. HRSG-4 NOS. AND 36MW STEAM TURBINE-2 NOS. COMMISSIONED SUCCESSFULLY IN 190 MW COMBINED CYCLE POWER PLANT AT RANHILL POWERTRAN LTD., KOTAKINABALU, MALAYSIA,. 85 TPH TAIL GAS FIRED POWER BOILER COMMISSIONED SUCCESSFULLY AT ALEXANDRIA CARBON BLACK CO., ALEXANDRIA, EGYPT. HOFINCONS INFOTECH and INDUSTRIAL SERVICES PRIVATE LIMITED, CHENNAI, TAMILNADU, INDIA SITE MANAGER (O and M) - OCTOBER 2004 TO JUNE 2007 SITE: 15 MW COAL FIRED CAPTIVE POWER PLANT, CHETTINAD CEMENT CORPORATION LIMITED, KARUR, INDIA KEY RESPONSIBILTIES: RESPONSIBLE FOR BOILER COLD START-UP, TURBINE COLD START-UP AND SYNCHRONIZE THE PLANT WITH EB GRID POWER AND MAINTAIN THE MAXIMUM PLANT LOAD FACTOR. PREPARATION OF EQUIPMENT SAFE OPERATING PROCEDURES AND EFFICIENTLY RUN THE THERMAL POWER PLANT BY WATCHING AND MONITORING ALL THE PARAMETERS OF BOILER, TURBINE, COOLING TOWER, R.O and D.M. PLANT AND FUEL HANDLING SYSTEM. EXPLORING THE POSSIBILITIES OF DEVELOPMENT ACTIVITIES WITH THE VIEW OF ENERGY SAVING, BREAKDOWNS REDUCTION, OPERATIONAL FLEXIBILITY and IMPROVEMENT AND IMPLEMENTING THOSE WHICH ARE TECHNICALLY, FINANCIALLY AND ECONOMICALLY VIABLE. PAYS PARTICULAR ATTENTION TO SAFETY BY ENSURING SAFE WORKING PRACTICE AND ENVIRONMENT FOR MEN AND MACHINERY. FINDING THE WAYS FOR CONTINUAL IMPROVEMENT IN THE PLANT AND ACHIEVING THE GOALS BY IMPROVING THE PLANT PERFORMANCE. ARRANGING THE SPARES AND INVENTORY CONTROL FOR CAPTIVE THERMAL POWER PLANT. PREPARATION OF DAILY, MONTHLY and YEARLY PLANT PERFORMANCE REPORT INCLUSIVE OF COST OF POWER GENERATION, PLANT HEAT RATE, BOILER EFFICIENCY, SPECIFIC FUEL CONSUMPTION, RAW and DM WATER CONSUMPTION, LOSS OF IGNITION, TURBINE SPECIFIC STEAM RATE, AUX. POWER CONSUMPTION, PLANT LOAD FACTOR, HEAT BALANCE CALCULATIONS, PLANT RUNNING HOURS AND DOWN TIME. PREPARATION OF MAINTENANCE SCHEDULES, LUBRICATION SCHEDULES, PREVENTIVE MAINTENANCE RUN CHECK LISTS, STOP CHECK LISTS FOR MECHANICAL, ELECTRICAL and INSTRUMENTATION MAINTENANCE AND CONDITION MONITORING OF ALL ROTATING EQUIPMENT BY TAKING THE VIBRATION READINGS PERIODICALLY AND IMPROVE THE HEALTHINESS OF THE EQUIPMENT. PLANNING AND SCHEDULING ALL THE SHUTDOWN MAINTENANCE JOBS, MANPOWER, CONSUMABLES, SPARES AND COMPLETING THE JOBS WITHIN THE STIPULATED TIME. MAJOR ACHIEVEMENTS: 15 MW COAL BASED THERMAL POWER PLANT AUXILIARY POWER CONSUMPTION REDUCED FROM 9.5% TO 7.75% 100% HIGH ASH COAL UTILISATION IN THE BOILER ACHIEVED BY MODIFYING THE DRAG CHAIN FEEDERS FUEL FLOW ARRANGEMENT. SOFT WATER CONSUMPTION REDUCED FROM 202 M^3 TO 136 M^3 PER DAY.

Previous :

CONSTRUCTION MANAGER, BHARAT HEAVY ELECTRICALS LIMITED

RAICHUR

Worked from 2000 to 2004

Brief summary :

LOSS OF IGNITION (LOI) IN FUEL REDUCED FROM 10.6% TO 4.9%. FREQUENT BEARING FAILURE OF CONDENSATE EXTRACTION PUMP DUE TO HIGH VIBRATION WAS AVOIDED BY MODIFYING THE BASE FRAME AND VIBRATION LEVEL REDUCED FROM 10.6 MM/SEC TO 2.8 MM/SEC. FREQUENT FAILURE OF FLIP-FLAP VIBRATION SCREEN SPRINGS AND BOTTOM DECK SHAFT WAS AVOIDED BY MODIFYING THE SHAFT ARRANGEMENTS. COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEM IMPLEMENTED SUCCESSFULLY. SAFETY RELATED IMPROVEMENT JOBS 146 DONE IN A YEAR AND GET THE AWARD FROM THE MANAGEMENT. SAFETY AND TECHNICAL TRAINING PROGRAMS CONDUCTED EVERY WEEK AND PLANT PERFORMANCE IMPROVED. AS PER THE EXTERNAL AGENCY (AVANT-GARDE) PLANT MAINTENANCE AUDIT, THEY HAVE CERTIFIED THAT POWER PLANT MAINTENANCE IS GOOD. BHARAT HEAVY ELECTRICALS LIMITED, CHENNAI, TAMILNADU, INDIA CONSTRUCTION MANAGER (Boiler) - JULY 2000 TO SEPTEMBER 2004 SITE: 2 x 210 MW COAL FIRED THERMAL POWER PLANT, RAICHUR THERMAL POWER STATION, RAICHUR, INDIA KEY RESPONSIBLITIES: PLANNING AND EXECUTION OF THE BOILER CONSTRUCTION AND ACHIEVING THE MILES STONES IN STIPULATED TIME. PREPARING OVER ALL CONSTRUCTION SCHEDULES OF BOILER STRUCTURES, DRUM LIFTING, PRESSURE PARTS, ECONOMIZER, AIR PREHEATER, DUCTINGS, ESP, FANS AND PIPING INSTALLATION. CONDUCTING MEETING WITH ALL CONSTRUCTION ENGINEERS AND SOLVING CONSTRUCTION PROBLEMS AND MONITORING THE PROJECT PROGRESS.

Previous :

ASSISTANT, SUN PAPER MILL LIMITED

INDIA

Worked from 1995 to 2000

Brief summary :

PLANNING AND MONITORING QUALITY REQUIREMENT OF THE WORK SITE WITH QA and QC PLANNING AND MONITORING THE SAFETY REQUIREMENT OF THE WORK SITE. CONDUCT SAFETY MEETING WITH CONSTRUCTION TEAM AND MAKE THE SAFETY PROCEDURE FOR SAFE LIFTING OF BOILER EQUIPMENT. ESTIMATION OF TECHNICAL REQUIREMENTS SUCH AS MANPOWER, EQUIPMENT, TOOLS AND CONSUMABLES ETC. MAJOR ACHIEVEMENTS: ZERO ACCIDENT ACHIEVED DURING BOILER CONSTRUCTION AND GET THE AWARD FROM THE MANAGEMENT. BOILER CONSTRUCTION MILES STONES SUCCESSFULLY COMPLETED AS PER THE SCHEDULED TIMES. SUN PAPER MILL LIMITED, CHERANMAHADEVI, INDIA ASSISTANT MANAGER - APRIL 1995 TO JUNE 2000 10 MW (60%COAL+40%BIOFUEL) CO-GENERATION POWER PLANT KEY RESPONSIBILITES: RESPONSIBLE FOR BOILER COLD START-UP, TURBINE COLD START-UP AND SYNCHRONIZE THE PLANT WITH EB GRID POWER AND MAINTAIN THE MAXIMUM PLANT LOAD FACTOR. PREPARATION OF EQUIPMENT SAFE OPERATING PROCEDURES AND EFFICIENTLY RUN THE THERMAL POWER PLANT BY WATCHING AND MONITORING ALL THE PARAMETERS OF BOILER, TURBINE, COOLING TOWER, R.O and D.M. PLANT AND FUEL HANDLING SYSTEM. MAJOR ACHIEVEMENTS: ACHIEVED OPTIMUM POWER GENERATION WITH LESSER FUEL CONSUMPTION BY FINE TUNING THE OPERATION PARAMETERS. POWER PLANT CONTINUOUSLY OPERATED 146 DAYS WITHOUT ANY TRIPPING AND BREAKDOWN AND SUPPLY POWER AND STEAM TO PAPER PROCESSING PLANT. PROMOTED TO ASSISTANT MANAGER (CO-GEN) FROM SHIFT ENGINEER IN A SHORT DURATION ON THE BACK OF GOOD PERFORMANCE. CETHAR VESSELS PRIVATE LIMITED, TIRUCHIRAPALLI, INDIA ERECTION and COMMISSIONING ENGINEER - OCTOBER 1986 TO FEBRUARY 1995 KEY RESPONSIBILITIES: LEAD THE ERECTION and COMMISSIONING TEAM, DRAWING STUDY, PREPARATION OF ERECTION and COMMISSIONING SCHEDULES, PERIODICAL ERECTION CHECK LISTS, COMMISSIONING PROCEDURES and CHECK LISTS. CO-ORDINATION FOR INDIAN BOILER REGULATION FORMALITIES AND GET THE APPROVAL FROM THE DIRECTOR OF THE BOILERS FOR HIGH PRESSURE BOILERS ERECTION. MATERIAL FOLLOW-UP FROM THE MANUFACTURING UNIT TO COMPLETE THE PROJECT IN TIME. PROVIDING REGULAR FEED BACK TO ENGINEERING DEPARTMENT REGARDING SUGGESTED AREAS IMPROVEMENT AND BOILER PERFORMANCE. CONDUCTING PERFORMANCE GUARANTEE TEST OF BOILERS ARRANGING OF BOILER ERECTION CONTRACTORS AND CASH FLOW MANAGEMENT. MAJOR ACHIEVEMENTS: ERECTED and COMMISSIONED MANY HIGH PRESSURE STEAM BOILERS RANGING FROM 32 TPH TO 120 TPH (PR.: 45 TO 105 Kg/cm2, TEMP.: 4450 C TO 5250 C.) IN VARIOUS LOCATIONS ALL OVER INDIA. ERECTED and COMMISSIONED VARIOUS TYPES OF BOILERS LIKE AFBC BOILERS, TRAVELLING GRATE, DUMPING GRATE BOILERS, WASTE HEAT RECOVERY BOILERS, BAGASSE FIRED, COAL FIRED, AGRO-WASTE FIRED, BIOMASS FIRED, OIL FIRED, NATURAL GAS and TAIL GAS FIRED BOILERS. ESTABLISHED A GOOD REPUTATION WITH THE CLIENTS AS A COMMISSIONING ENGINEER AND A PREFERED ASSOCIATE OF THE CLIENTS.

 
 
Featured Career Adviser
FIRST CALL Recruitment & HR Services Company
Customer Project SW Architect Jobs in Bangalore
Mobile Platform SW Architect Jobs in Bangalore
Connectivity SW Architect Jobs in Bangalore
 
 
 
R.'s communities
35984 members, 591 jobs, 1220 articles, 573 questions, 1499 debates, 422 idea contests.
28210 members, 169 jobs, 221 articles, 263 questions, 420 debates, 181 idea contests.
7266 members, 156 jobs, 187 articles, 129 questions, 252 debates, 133 idea contests.
 
 
Related Topics
Open architecture is real and here to stay. Technology companies like Google...
4 trends , 3 insight , 4 debates , 1 idea contests , 3 question  
A key factor to IT project success is to work collaboriatively with other...
4 trends , 2 insight , 3 debates , 1 idea contests , 2 question  
Is Search Selection and Headhunting - is the same or different approach. If...
2 trends , 2 insight , 1 idea contests , 2 question