rajendra mishra's Profile
rajendra mishra's Experience
| Previous : |
Project Manager, general syndicate structure steel & metal fabrication co. |
|
| Construction | ||
Worked from 2010 to 2010 | ||
|
Brief summary :
controlling project, estimation, cost controlling, tender, quotation, worker staff controlling attending clients meetings etc. completed project successfully | ||
| Previous : |
senior engineer piping, gama qatar wll |
|
| Oil & Gas | ||
Worked from 2008 to 2009 | ||
|
Brief summary :
area in charge as piping engineer erection and installation of pipe | ||
| Previous : |
Bellei Energy FZE Co Hamariyafz Sharjah Site Superintendent |
|
Worked from 2006 to 2007 | ||
Brief summary :
Oct 2006- Oct 2007 Bellei Energy FZE Co. Hamariyafz Sharjah Site Superintendent | ||
| Previous : |
Dubai Supervisor, Lamprell Energy Co Structural |
|
Worked from 2005 to 2006 | ||
Brief summary :
Jun 2005- Oct 2006 Lamprell Energy Co., Dubai Supervisor Structural | ||
| Previous : |
MIS Co. Ltd. |
|
Worked from 2004 to 2005 | ||
Brief summary :
Nov 2004- Feb 2005 MIS Co. Ltd. Sharjah (U.A.E.) General Foreman | ||
| Previous : |
MISA Jubail Saudi Arabia General Foreman |
|
Worked from 2003 to 2004 | ||
Brief summary :
Aug 2003- Oct 2004 MISA Jubail Saudi Arabia General Foreman | ||
| Previous : |
Navi Construction Manager, Prashant Project Ltd. |
|
| Mumbai | ||
Worked from 2003 to 2003 | ||
Brief summary :
Feb 2003- May 2003 Prashant Project Ltd., Navi Mumbai Construction Manager | ||
| Previous : |
Kuwait Mechanical Supervisor, Almen (Tariq Al Ghanim Trading and Cont Co) |
|
Worked from 2002 to 2003 | ||
Brief summary :
Oct 2002- Feb 2003 Almen (Tariq Al Ghanim Trading and Cont. Co). Kuwait Mechanical Supervisor | ||
| Previous : |
Al Haduri Trading and Contracting Co( LG |
|
Worked from 2001 to 2001 | ||
Brief summary :
Sep 2001- Oct 2001 Al Haduri Trading and Contracting Co.( LG const co.) Kuwait Piping foreman | ||
| Previous : |
Consolidated Contractor, International CoAbu |
|
Worked from 1999 to 2000 | ||
Brief summary :
May 1999- May 2000 Consolidated Contractor International Co.Abu dhabi Foreman Piping/Steel | ||
| Previous : |
Neer Shree Cement , |
|
| Kota | ||
Worked from 1996 to 1999 | ||
Brief summary :
Mar 1996- May 1999 Neer Shree Cement, Kota Dy. Chief Draftsman (Mech) | ||
| Previous : |
Ltd. Calcutta Resident Engineer, Rediant Industries Ltd. |
|
Worked from 1995 to 1996 | ||
Brief summary :
Nov 1995- Feb 1996 Rediant Industries Ltd. Calcutta Resident Engineer | ||
| Previous : |
Delhi Junior Engineer, Naveen Projects Ltd. |
|
| Delhi | ||
Worked from 1994 to 1995 | ||
Brief summary :
Jun 1994- Nov 1995 Naveen Projects Ltd., Delhi Junior Engineer (Projects: Grasim cement project and DLF cement project) | ||
| Previous : |
Neer Shree Cement Rajasthan Senior Draftsman |
|
Worked from 1991 to 1994 | ||
Brief summary :
May 1991- May 1994 Neer Shree Cement, Rajasthan Senior Draftsman | ||
| Previous : |
Gujarat Ambuja Cements Limited |
|
Worked from 1986 to 1991 | ||
Brief summary :
Apr 1986- Apr 1991 Gujarat Ambuja Cements Limited, Kodinar Draftsman (Sekhsaria Chemicals Pvt. Ltd., Dombivali) (under deputation) | ||
| Previous : |
Govt. Of |
|
| India | ||
Worked from 1985 to 1986 | ||
Brief summary :
July1985- Apr 1986 Govt. of India Ministry of Transport (Road Wing) Draughtsman | ||
| Previous : |
Gujarat Ambuja Cements Limited |
|
Worked from 1984 to 1985 | ||
Brief summary :
May 1984- Jul 1985 Gujarat Ambuja Cements Limited (Bombay Office) Draftsman | ||
| Previous : |
Satna Cement |
|
| Satna | ||
Worked from 1982 to 1983 | ||
Brief summary :
Oct 1982- Oct 1983 Satna Cement works (M.P) App. Draftsman (Mech) CHIEF TASKS HANDLED Project Management Responsible for planning for project activities and manage construction work including site measurements, reviewing drawings, ensuring compliance with quality standards. Participating in project review meetings for evaluating project progress and de-bottlenecking. Liaising with clients and consultants on determining technical specifications and requirements, and commissioning. Fabrication/Erection Studying drawings, plans, patterns of pipes, equipments, tanks to be made / repaired as per the requirements. Preparing layouts for the project as per the process and material flow needs. Foreseeing performance bottlenecks and taking corrective measures to avoid the same. Site preparations, mobilization of contractors for carrying out fabrication and erection activities. Erection, commissioning of equipments, providing utility services to the equipments. Completed project of water evaporator project for sedam10 unit ,and fizia Italy 6 nos for dubai elec. And water authority dubai Site Management Anchoring on-site construction activities to ensure completion of project within the time and cost parameters and effective resource utilization to maximize the output. Preparing and reviewing of Method Statements and Work Specific Quality Control Plans. Ensuring that machineries/ equipment/materials received are in accordance with the quantity and quality. Team Management: Coordinating manpower planning competency building for implementation of new projects. Responsible for team building and providing effective leadership to realize the potential of every member of the team for delivering quantifiable results. Contract Administration Involved in Vendor value worth analysis and selection based on technical and financial competencies. Preparation of technical specifications and scope and deliverables, estimates and BOQ based on requirements generated during detailed engineering of the project. Coordinating procurement activities like Tendering and Bid Management, Estimations, Techno-Commercial Evaluations, Contract Negotiations, etc. Key Projects Handled gas Compressor Barges Modules Platforms, skids, Piping Supports for SBM saipam, reliance, Fabrication and erection of Pressure Vessels, Structural Platforms, Tanks, Heat Exchanger, Evaporators, Piping Shut Down Job, etc. Construction of new 24 IRT pipeline (Cross country) between Mab And Shuiba inter-refineries; fabrication of Spools, Pipe Supports Structural Platforms, tie in jobs, etc.in Kuwait Fabrication, Erection, Maintenance of Vehicles, etc. Erection fit up New GOD unit piping (short term job). Maintenance of Compressors, Blowers, Conveyors Gearbox, Pipeline Erection, Fabrication and Erection. Erection of hydraulic truck unloaded and fabrication and erection high coal and Low coal blending system and belt bucket elevator erection and shut down work pipeline work, brick lining work. Erection, fabrication and supervision of belt conveyor; handled site independently with total responsibilities at D.L.F. Cement Limited, Rabriyabas, Dist. Pali (Raj). Project at Grassim Cement site, Rawan Raipur (M.P) managed fabrication and erection of conveyor Galleries, Structures, towers, Platforms and piping supervision of above work. Fabrication and erection of structural work, stack, Hopper, Conveyor Galleries (specially Looked out Fabrication and erection of 4 Mtr. Dia Chimney -110 Mtr. Height) steel hopper, platform and Equipment erection, with total responsibility of projects independently controlled labour, site cost, completing project in scheduled time. Achieved process improvement by power saving arrangement and saved power consumption in cement plants, Coals Blending System arrangement made for smooth flow of coal in coal mill and kiln. Received appreciation letter from Gujarat Ambuja Cement Ltd., Managing Director for work in workers strikes. Appreciation letter from Grasim cements for excellent work. Appreciation letter from SBM co. for hard and good supervision work in Dubai. Taking incident injury free session class.safety tool box talks.leading safet orientation iif classes Taking permit from clint Qatar Gas/CTJV applied for permit to work and taking care for safety related work, approved for work to permit recciver and authorized for applied. Making technical quarry. For extra work, solving problems etc. Presently I am working in Gas(LNG) onshore project in Qatar Gas. In Doha Qatar Observing task Instruction/safety, leading stand down meeting of safety. | ||
| Previous : |
Kuwait Control Co Kuwait Mechanical and Piping |
|
Brief summary :
Nov 2001- Sep- 2002 Kuwait Control Co., Kuwait Mechanical and Piping supervisor | ||
rajendra mishra's Education
British Institute Mumbai |
|
| Diploma | |
| India | |
| From 1999 to 2001 | |
British Institute Mumbai |
|
| Diploma | |
| India | |
| From 1999 to 2001 | |
|
Brief summary :
passed Diploma in Mechanical engineering with first class | |
Sponsored Jobs
Featured Career Adviser
rajendra's communities
|
10213 members, 379 jobs, 894 articles, 282 questions, 935 debates, 319 idea contests.
|
|
25987 members, 211 jobs, 568 articles, 570 questions, 621 debates, 368 idea contests.
|
Related Topics
1 trends
, 7 insight
, 2 debates
, 4 idea contests
, 8 question
Generally, construction sites are considered as more unsafe than normal...
1 trends
, 6 insight
, 8 debates
, 11 idea contests
, 8 question
2 trends
, 4 insight
, 6 debates
, 1 idea contests
, 3 question
Viewers also viewed
|
(167 Points)
|
|
10
(6,692 Points)
|






