Build your professional network on facebook via our app Go to app
Rajesh Construction-Construction Management, Larsen & Toubro
 
Create knowledge [?]
 
(rate this)
1 Temperature Changes
2 FINAL SETTING TIME OF CEMENT IS 600MIN.AS SOON AS THIS TIME FINISH WE SHOULD START CURING.IF NOT THEN CEMENT STARTS HYDRATION
Abdul Quaiyoom Mansoor  |  Added idea  "Not following the quality control measures as provided by different IS codes."  |  13 days ago
Whatever the ideas have been delivered by our friends above are very correct why concrete get cracked before its designed life. It is frequently seen in the field that even big contractors are reluctant and most of the time deliberately do not...
Rajesh  |  Added idea  |  2 years ago
It is observed that if the founding soil comes under uneven settlement, vertical as well as diagonal crack develops in the structure resting on the said founding soil
Abdul Quaiyoom Mansoor  |  Supported idea  "Temperature Changes"  |  2 years ago
We assume concrete as an isotropic material but this property can not be achieved 100% and in real, concrete is a 3-phase material. The three phases are metal chips, sand-cement mortar and the third one is the junction of these two. Hair cracks...
 
 
Ideate: "Why does concrete crack?" deleted from your view.
Undo
 
(rate this)
1 Temperature Changes
2 FINAL SETTING TIME OF CEMENT IS 600MIN.AS SOON AS THIS TIME FINISH WE SHOULD START CURING.IF NOT THEN CEMENT STARTS HYDRATION
Abdul Quaiyoom Mansoor  |  Added idea  "Not following the quality control measures as provided by different IS codes."  |  13 days ago
Whatever the ideas have been delivered by our friends above are very correct why concrete get cracked before its designed life. It is frequently seen in the field that even big contractors are reluctant and most of the time deliberately do not...
Rajesh  |  Added idea  |  2 years ago
It is observed that if the founding soil comes under uneven settlement, vertical as well as diagonal crack develops in the structure resting on the said founding soil
Abdul Quaiyoom Mansoor  |  Supported idea  "Temperature Changes"  |  2 years ago
We assume concrete as an isotropic material but this property can not be achieved 100% and in real, concrete is a 3-phase material. The three phases are metal chips, sand-cement mortar and the third one is the junction of these two. Hair cracks...
 
 
Ideate: "Why does concrete crack?" deleted from your view.
Undo
 
(rate this)
1 Construction of What?
2 Depends on Scope and Functional Requirements...
SHRIKANT MANOHAR DANKE  |  Supported idea  "Depends on Scope and Functional Requirements..."  |  1 year ago
Depends upon type of construction & the region in which it is to be constructed , & scope should be mentioned
Rajesh  |  Added idea  |  2 years ago
Soil is the vital and basic material in any construction activity. Charactaristic of soil plays important role in foundation and subbase of any construction activity.
Rajesh  |  Supported idea  "Construction of What?"  |  2 years ago
Every day in our life we are constructing something. the type and nature depands on our requirement/need. It is wast field named as construction.
 
 
Ideate: "What should be the major part of any construction. I mean which material?" deleted from your view.
Undo
 
(rate this)
1 Construction of What?
2 Depends on Scope and Functional Requirements...
SHRIKANT MANOHAR DANKE  |  Supported idea  "Depends on Scope and Functional Requirements..."  |  1 year ago
Depends upon type of construction & the region in which it is to be constructed , & scope should be mentioned
Rajesh  |  Added idea  |  2 years ago
Soil is the vital and basic material in any construction activity. Charactaristic of soil plays important role in foundation and subbase of any construction activity.
Rajesh  |  Supported idea  "Construction of What?"  |  2 years ago
Every day in our life we are constructing something. the type and nature depands on our requirement/need. It is wast field named as construction.
 
 
Ideate: "What should be the major part of any construction. I mean which material?" deleted from your view.
Undo
 
(rate this)
1 Awareness is the key
2 Providing incentives by tax duduction
Chitro Neogy  |  Supported idea  "Awareness is the key"  |  2 years ago
Actually, we did a ROI study based more on USGBC standards and found that the payback period on most commercial buildings are between 2 to 5 years, if LEED and sustainable concepts are incorporated from the ground up. I will try to dig up and...
Rajesh  |  Added idea  |  2 years ago
Common man's worry is good home at cost effective rate, so that one can get best eco friendly home at achivable prices. If this can be done by implementation at grass root level i.e by estate developers and or builders.Advertisement will play a big...
Avnindra Kumar Mathur  |  Supported idea  "Awareness is the key"  |  2 years ago
Yes, in fact awareness is the starting point for any action to be initiated and there should not be any doubt about this. So - awareness programs needs to be conducted regularly for all concerned. This is being carried out by CII Hydrabad. Such...
 
 
Ideate: "How can we entice the common man to build green homes on the LEED model?" deleted from your view.
Undo
Follow me on
TooStep
 
 
Contributions and Connections
 
 
77 Contribution Points
0
0 Expert Badges
[?]
4
Connections
5
Following
3
Followers
[?]