Build your professional network on facebook via our app Go to app
Ramachandra Rao.M Construction-Residential, Vasathi Housing & Infra
 
Create knowledge [?]
 
(rate this)
1 Construction field to Software field
Ramachandra Rao.M  |  Added idea  "Construction field to Software field"  |  11 months ago
Hai, am working in construction field as QS, with BE civil background for last 5 yrs. Now i want to take a jump to sap mm. Any one can give your suggestions pls. it can help to my career.
 
 
Ideate: "Construction field to Software field" deleted from your view.
Undo
 
(rate this)
What is the density of Binding Wire
 
 
Answer: "Binding Wire Density" deleted from your view.
Undo
 
(rate this)
Hi, Tell me HOW TO CALCULATE THE LENGTH OF A BINDING WIRE OF 18 GAUGE FROM THE COIL WEIGHT?
 
 
Answer: "Length of Binding Wire" deleted from your view.
Undo
 
(rate this)
Hi, Tell me the exact meaning of Reconcilation in Construction industry?
 
 
Answer: "What is the meaning of Reconcilation in Construction industry?" deleted from your view.
Undo
 
(rate this)
Dear Madam, Which IS Code is suitable for Calculation of Shuttering Quantities and Execution of Shuttering Work?
sreenivas reddy  |  Answered  |  12 months ago
calculation methedology for shuttering works
sreenivas reddy  |  Answered  |  12 months ago
purpose of shuttering material in the slab foam work
 
 
Answer: "What is the IS Code that used for Shuttering Works in Construction?" deleted from your view.
Undo
 
(rate this)
1 Lack of visualisation
2 Lack of Practical knowledge
pandianarjunan  |  Supported idea  "Lack of visualisation"  |  1 year ago
without visualisation no costestimate can be prepared.But without practical knowledge no estimate will accurate.A pile depth can be had from the report, but the risks of sliding and penetration can be calculated by practical knowledge only.An...
Ramachandra Rao.M  |  Supported idea  |  3 years ago
hai, how can we calculate the material requirement for concreting and plastering? are these methods vary w.r.t. their proportions?
Shaju George  |  Supported idea  "Lack of visualisation"  |  3 years ago
Correct.. once you can visualise plans properly, chances of errors are very less.
 
 
Ideate: "Common errors in construction cost estimation" deleted from your view.
Undo
Follow me on
TooStep
 
 
Contributions and Connections
 
 
71 Contribution Points
0
0 Expert Badges
[?]
13
Connections
14
Following
8
Followers
[?]