Ravneet Singh Bhatia's Experience
Current :

Owner, Infrastructure Project Management Group

Construction

Working from 1994

Previous :

Infrastructure Project Management Group ,

Chandigarh

Worked from 2004 to 2012

Brief summary :

Since Mar04: Infrastructure Project Management Group, Chandigarh as Self employed project management consultant Project Overview: Plumbing of 128 Flats for M/s CTC Geotechnical Pvt. Ltd at Ansals Orchid County Landran 112 Lac (12 Months) Interior for M/s Atlas Copco 33.5 Lacs (50 Days) Exhibit Installation for Meroform at Khalsa Heritage Complex 25 Lacs (60 Days) DLF Infocity Chandigarh: Rs. 73 lakhs (1 year) Khalsa Heritage Complex for MRS Corporation, Delhi - PMC: Rs. 900 lakhs (1 year) Shop Drawing and Construction of Sample Flat for Pioneer Landcons Pvt. Ltd.: Rs. 5.25 lakhs (15 days) Site Survey, Concept Planning and Designing Project Proposal Presentation for BPO of Sony Ericsson at DLF Infocity Chandigarh: Rs. 1.5 lakhs (7 days) Finishing and Services of Pharma Unit at Barotiwala for Impero: Rs. 36 lakhs (180 days) Development of Dell Computer Centre at Blind Institute: Rs 50 thousand (5 days) Branding Work Stations for Dell: Rs. 4 lakhs (28 days) Construction of Pharma Unit at Barotiwala for Impero: Rs. 15 lakhs (120 days) Consultancy for Densification for Dell Design and Consultancy: Rs. 2.5 lakhs (90 days) Densification of Work Stations for Dell: Rs. 25 lakhs (90 days) Interior for HR Johnson at Gurgaon: 35 lakhs (120 days) Interior Work at Dell, Mohali: Rs. 10 lakhs Project Management for Dell at Mohali: Rs. 1200 lakhs (120 days) Construction of Tower Sites for Hutchisson Essar South Limited: 5 lakhs (45 days) Design and Interior of Temporary Office for Hutchison Essar South Limited - Design, Consultancy and Contracting: Rs. 7 lakhs (3 days) Interior of Reliance Web Stores: Rs. 35 lakhs (90 days) Design of Reliance Web Stores - Design and Consultancy: Rs. 1.5 lakhs (7 days for each site) - 7 sites Significant Highlights: Initiatives taken to execute projects on time and within budget by proper planning of execution/ cash flow/ coordination / materials and human resource Initiatives taken to build competencies of teams through guidance and training

Previous :

M/s CTC Geotechnical Pvt. Ltd

Worked from 2004 to 2011

Brief summary :

Since Mar04: Infrastructure Project Management Group Project Overview: Plumbing of 128 Flats for M/s CTC Geotechnical Pvt. Ltd at Ansals Orchid County Landran 112 lakhs (12 Months) Interior for M/s Atlas Copco 33.5 lakhs (50 Days) Exhibit Installation for Meroform at Khalsa Heritage Complex 25 lakhs (60 Days) DLF Infocity Chandigarh: Rs. 73 lakhs (1 year) Khalsa Heritage Complex for MRS Corporation, Delhi - PMC: Rs. 900 lakhs (1 year) Shop Drawing and Construction of Sample Flat for Pioneer Landcons Pvt. Ltd.: Rs. 5.25 lakhs (15 days) Site Survey, Concept Planning and Designing Project Proposal Presentation for BPO of Sony Ericsson at DLF Infocity Chandigarh: Rs. 1.5 lakhs (7 days) Finishing and Services of Pharma Unit at Barotiwala for Impero: Rs. 36 lakhs (180 days) Development of Dell Computer Centre at Blind Institute: Rs 50 thousand (5 days) Branding Work Stations for Dell: Rs. 4 lakhs (28 days) Construction of Pharma Unit at Barotiwala for Impero: Rs. 15 lakhs (120 days) Consultancy for Densification for Dell Design and Consultancy: Rs. 2.5 lakhs (90 days) Densification of Work Stations for Dell: Rs. 25 lakhs (90 days) Interior for HR Johnson at Gurgaon: 35 lakhs (120 days) Interior Work at Dell, Mohali: Rs. 10 lakhs Project Management for Dell at Mohali: Rs. 1200 lakhs (120 days) Construction of Tower Sites for Hutchisson Essar South Limited: 5 lakhs (45 days) Design and Interior of Temporary Office for Hutchison Essar South Limited - Design, Consultancy and Contracting: Rs. 7 lakhs (3 days) Interior of Reliance Web Stores: Rs. 35 lakhs (90 days) Design of Reliance Web Stores - Design and Consultancy: Rs. 1.5 lakhs (7 days for each site) - 7 sites

Previous :

Consultant, Reliance Engineering Associates Pvt. Ltd.

Mohali

Worked from 2001 to 2004

Brief summary :

Dec01-Mar04: Reliance Engineering Associates Pvt. Ltd., Mohali as Consultant Engineer Project Overview: Construction of MCN Building, BTS Towers and Ducting Trenching Work for Reliance Infocom Ltd., Julundur, Multistory Framed Structure, Media Convergence Node, BTS Towers and NBB and MA Routes.

Previous :

Consultant, Reliance Engineering Associates Pvt. Ltd.

Worked from 2001 to 2004

Brief summary :

Dec01-Mar04: Reliance Engineering Associates Pvt. Ltd. as Consultant Engineer Project Overview: Construction of MCN Building, BTS Towers and Ducting Trenching Work for Reliance Infocom Ltd., Julundur, Multistory Framed Structure, Media Convergence Node, BTS Towers and NBB and MA Routes.

Previous :

Executive Civil Engineer, Pvt. Ltd.

Mohali

Worked from 2000 to 2001

Brief summary :

Mar00-Nov01: Quark infrastructure Pvt. Ltd., Mohali as Executive Civil Engineer Project Overview: Construction of Quark Media House (India) Pvt. Ltd., Mohali: Multistory framed structure, with curtain glazing and bush hammered Dholpur in exterior, (granite, wooden, raised and epoxy) flooring, (metallic, mineral fiber, pop, gypsum and wooden) false ceiling including facilities viz., swimming pool, softening plant, filteration plant, activated carbon filter, reverse osmosis plant, copper piping, automation of water supply, health club, bitumen road, etc.

Previous :

Executive Civil Engineer, Pvt. Ltd.

Mohali

Worked from 2000 to 2001

Brief summary :

Mar00-Nov01: Quark infrastructure Pvt. Ltd., Mohali as Executive Civil Engineer Project Overview: Construction of Quark Media House (India) Pvt. Ltd., Mohali: Multistory framed structure, with curtain glazing and bush hammered Dholpur in exterior, (granite, wooden, raised and epoxy) flooring, (metallic, mineral fiber, pop, gypsum and wooden) false ceiling including facilities viz., swimming pool, softening plant, filteration plant, activated carbon filter, reverse osmosis plant, copper piping, automation of water supply, health club, bitumen road, etc.

Previous :

Housing Pvt. Ltd.

Chandigarh

Worked from 1998 to 2000

Brief summary :

Mar98-Feb00: Pushpac Co-operative Housing Pvt. Ltd., Chandigarh as Senior Site In charge Project Overview: Construction of 590 Residential Flats to a semi finished state including external services (public health works, road work, electrification and setting of electrical substation).

Previous :

Housing Pvt. Ltd.

Chandigarh

Worked from 1998 to 2000

Brief summary :

Mar98-Feb00: Pushpac Co-operative Housing Pvt. Ltd., Chandigarh as Senior Site In charge Project Overview: Construction of 590 Residential Flats to a semi finished state including external services (public health works, road work, electrification and setting of electrical substation).

Previous :

Project Engineer, Chawla Techno Construct Ltd.

New Delhi

Worked from 1994 to 1998

Brief summary :

Aug94-Feb98 : Chawla Techno Construct Ltd., New Delhi as Project Engineer Project Overview: Interior Work at Taj Man Singh, New Delhi (Five Star Hotel at Delhi): Renovation of guest floors includes interior of 23 rooms, 2suites, lift lobby and corridor on each floor. Interior of room involves sound insulation of walls, false ceiling, provision of fire sprinklers, carpeting, fixed furniture, loose furniture, air conditioning, etc. Interior of toilet involves granite flooring, granite and tile combination in cladding, installation of bath tub, telephone point, etc. Renovation of Reliance Guest House, New Delhi Renovation of structure which involves changing complete layout of existing Belgium Embassy Building to new proposed layout of Reliance Guest house, without demolishing existing slabs, adding in helicoidal staircase, lift area, terrace garden, central air conditioning system, etc. Interior of Dabur Corporate Office, New Delhi Interior work including HVAC work, full height and low height partition, sound insulation, workstation, false flooring, granite murals, full ht wooden paneling, glass work (etching, frosting and 3OG beveling), storage and loose furniture. Construction of farm yards at Ghamroj (for Dabur India Ltd.) Fencing of 32 acres of land with pre cast poles, construction of tractor shed, managers residence at Ghamroj. Construction of The Capital Court Ltd. at Munirka, New Delhi. For Lal Bhai Realty Ltd. Scope of work : Construction of multistory office complex which involves 7 story flat slab structure, with provision of three capsule lift, one service lift, fire escape staircase, with interior of toilets, pantry, lift lobby, atrium, and exterior with combination of aluminum and granite cladding, structural glazing, curtain wall glazing, with provision of curtain glazing. Construction of 25 story residential structure for DLF Ltd.(Gurgaon) Consultancy Work: Prepration of bill of quantity for Dutt Designs Projects :Estimate for interior peculiar to lift, lift lobby and guest floor corridor of Ashoka Hotel(New Delhi) Quantity surveying, preparation of specification for typical interior work, rate analysis for non scheduled items, complete cost estimate. Sponsorships from Company : Member of Quality control forum of India Course of AutoCAD from Aptech. Attended special program on formwork and scaffholding design organised by National Council for Cement and Building Materials at IIT, Chennai.

Previous :

Project Engineer, Chawla Techno Construct Ltd.

New Delhi

Worked from 1994 to 1998

Brief summary :

Aug94-Feb98 : Chawla Techno Construct Ltd., New Delhi as Project Engineer Project Overview: Interior Work at Taj Man Singh, New Delhi (Five Star Hotel at Delhi): Renovation of guest floors including interior of 23 rooms, 2suites, lift lobby and corridor on each floor. Interior of room involves sound insulation of walls, false ceiling, provision of fire sprinklers, carpeting, fixed furniture, loose furniture, air conditioning, etc. Interior of toilet involves granite flooring, granite and tile combination in cladding, installation of bath tub, telephone point, etc. Renovation of Reliance Guest House, New Delhi Renovation of structure which involves changing complete layout of existing Belgium Embassy Building to new proposed layout of Reliance Guest house, without demolishing existing slabs, adding in helicoidal staircase, lift area, terrace garden, central air conditioning system, etc. Interior of Dabur Corporate Office, New Delhi Interior work including HVAC work, full height and low height partition, sound insulation, workstation, false flooring, granite murals, full ht wooden paneling, glass work (etching, frosting and 3OG beveling), storage and loose furniture. Construction of farm yards at Ghamroj (for Dabur India Ltd.) Fencing of 32 acres of land with pre cast poles, construction of tractor shed, managers residence at Ghamroj. Construction of The Capital Court Ltd. at Munirka, New Delhi. For Lal Bhai Realty Ltd. Scope of work : Construction of multistory office complex which involves 7 story flat slab structure, with provision of three capsule lift, one service lift, fire escape staircase, with interior of toilets, pantry, lift lobby, atrium, and exterior with combination of aluminum and granite cladding, structural glazing, curtain wall glazing, with provision of curtain glazing. Construction of 25 story residential structure for DLF Ltd.(Gurgaon) Consultancy Work: Prepration of bill of quantity for Dutt Designs Projects :Estimate for interior peculiar to lift, lift lobby and guest floor corridor of Ashoka Hotel(New Delhi) Quantity surveying, preparation of specification for typical interior work, rate analysis for non scheduled items, complete cost estimate. Sponsorships from Company : Member of Quality control forum of India Course of AutoCAD from Aptech. Attended special program on formwork and scaffholding design organised by National Council for Cement and Building Materials at IIT, Chennai.

 
 
 
 
Ravneet's communities
25984 members, 211 jobs, 568 articles, 570 questions, 621 debates, 368 idea contests.
215 members, 5 jobs, 3 articles, 1 questions, 3 debates, 2 idea contests.
Ravneet's contributions
A little glimpse Who generates thought and generates emotion emotions are chemicals released by glands Who made Glands It's "NATURE" Not HUMAN Human's are caused by "NATURE" Emotions reflect's the "NATURE" The "GOD" within Every Where what is realized...
IF ONE CAN MANAGE, ALL OPTIONS SHALL BE OPEN. THERE AREE TWO SUCCESS POINTS ONE IS GETTING THE WILL, IN SITUATION GIVEN. SECOND IS GETTING THE SITUATION, FOR WILL, WHICH MEANS HARD WORK. SECOND OPTION IS BY ENTREPRENEUR'S ONE SHOULD NOT FIX MIND,...
 Courage/ Faith/ Dynamic/ Simplicity / Focus/ Knowledge/ Relations/ Capital/ Endurance
One should be self responsible, Higher You move, you are responsible for other's actions also. Higher level means greater self responsibility,  People always get fruit of there own actions. We should not take ownership of other's action, good or bad,...
LIFE IS A COIN,  MORE HAPPINNESS MORE SORROWS BIGGER THE HEAD, BIGGER THE TAIL.  MORE EARNING/MORE SPENDING MORE PHYSICAL SECURITY OUTSIDE/ LESS SECURITY INSIDE MIND. DO SEX WITH DISCIPLINE, SORROWS WILL BE LESS (SEX) EAT FOOD WITH DISCIPLINE, DISEASE...
 
Related Topics
Building construction is an important aspect in today's times with ever...
3 trends , 2 insight , 18 debates , 12 idea contests , 23 question  
Construction Management Course
2 question  
10 X online conference is first of its kind conference on TooStep . The Idea...
6 idea contests