As a Senior GM-Projects, overseeing projects like biomass based thermal power projects, erection and commissioning of air cooled steam condensers, erection and commissioning of power transmission lines etc. | ||
| Current : |
Sr.GM-Projects, GEI Industrial Systems Limited |
|
| Power | ||
Working from 2009 | ||
|
Brief summary :
As a Senior GM-Projects, overseeing projects like biomass based thermal power projects, erection and commissioning of air cooled steam condensers, erection and commissioning of power transmission lines etc. | ||
| Previous : |
A Team Leader, GEI Industrial Systems Limited |
|
| Fleet | ||
Worked from 2009 to 2012 | ||
Brief summary :
involves very extensive travelling due to additional responsibilities of Handling Fleet of West Africa and Surrounding Countries of India for Global Service Engineering Business Development. As A Team Leader, Delegating responsibility of establishment and stabilization of a robust team of engineers for providing customer claims/trouble-shooting and management of Services Business. GEI Industrial Systems Limited Since April 2009 to Dec, 2010 Position : Sr.GM-Project Services, Posted at Corporate Office at Bhopal but the work profile involves very extensive travelling due to additional responsibilities of Funding Arrangement and EPC Business Development. Delegated responsibility of establishment of a 300 MW Thermal Power Projects Air Cooled Steam Condenser, which is Indias First Air Cooled Condenser of 350 TPH Steam Flow capacity to be established at Beawar, Rajasthan. Another 350 TPH Steam Flow Capacity Air Cooled Steam Condenser project is at Tuticorin, Tamilnadu for which manufacturing is already under progress. Booked order worth 160 Crore Rs in the first year for EPC of Biomass Based Power Projects and As a Project Head, delegating Execution activities of a 10 MW Biomass Based Thermal Power Project at Burhanpur (MP), and Raipur (CG). Initiated preparation for execution activities of a 10 MW Biomass Based Thermal Power Project at Burhanpur, M.P. Completed Erection, Installation and Commissioning of (18 MW 2 + 6.5 MW ) 44.5 MW Air Cooled Steam Condenser Project at Beawer, Ajmer District, Rajasthan for M/s Shree Cement Limited. Completed Erection, Installation and Commissioning of 50 MW Air Cooled Steam Condenser Project at RAS, Pali District, Rajasthan for M/s Shree Cement Limited. I was a part of an estimation, costing and contracting team executing a Power Transmission Line Project at Bijnor, Uttar Pradesh, we are executing an order of more than Rs. 100 million (USD 2.25 million) which covers Rural Electrification of 400 villages, erection of four new Switchyards of 33/11 KV, 5 MW each and augmentation of seven existing switchyards. We have applied for projects of Power Transmission Line EPC and Erection and Commissioning up to 132 KV. We intend to outsource major electrical equipment and manufacture the structures in-house. We were engaged in the field of 33 KV sub-stations, including control buildings, erection of new sub-stations, upgradation / renovation of existing sub-stations, capacity augmentation of switchyards. Suggestion offered: Suggested to procure Tower Crane model 7050 instead of hiring a mechanical / hydraulic crane for all material handling operations for erection of 300 MW Air Cooled Steam Condensers. Suggested to take minimum 5% stack holding in the power generation company which has given us EPC contract to build two nos biomass based power projects. Suggested to arrange Project Funding through NBFCs (Pricewaterhouse Coopers) at lower interest rate and liberal terms and conditions. | ||
| Previous : |
A Team Leader, GEI Industrial Systems Limited |
|
| Fleet | ||
Worked from 2009 to 2012 | ||
Brief summary :
involves very extensive travelling due to additional responsibilities of Handling Fleet of West Africa and Surrounding Countries of India for Global Service Engineering Business Development. As A Team Leader, Delegating responsibility of establishment and stabilization of a robust team of engineers for providing customer claims/trouble-shooting and management of Services Business. GEI Industrial Systems Limited Since April 2009 to Dec, 2010 Position : Sr.GM-Project Services, Posted at Corporate Office at Bhopal but the work profile involves very extensive travelling due to additional responsibilities of Funding Arrangement and EPC Business Development. Delegated responsibility of establishment of a 300 MW Thermal Power Projects Air Cooled Steam Condenser, which is Indias First Air Cooled Condenser of 350 TPH Steam Flow capacity to be established at Beawar, Rajasthan. Another 350 TPH Steam Flow Capacity Air Cooled Steam Condenser project is at Tuticorin, Tamilnadu for which manufacturing is already under progress. Booked order worth 160 Crore Rs in the first year for EPC of Biomass Based Power Projects and As a Project Head, delegating Execution activities of a 10 MW Biomass Based Thermal Power Project at Burhanpur (MP), and Raipur (CG). Initiated preparation for execution activities of a 10 MW Biomass Based Thermal Power Project at Burhanpur, M.P. Completed Erection, Installation and Commissioning of (18 MW 2 + 6.5 MW ) 44.5 MW Air Cooled Steam Condenser Project at Beawer, Ajmer District, Rajasthan for M/s Shree Cement Limited. Completed Erection, Installation and Commissioning of 50 MW Air Cooled Steam Condenser Project at RAS, Pali District, Rajasthan for M/s Shree Cement Limited. I was a part of an estimation, costing and contracting team executing a Power Transmission Line Project at Bijnor, Uttar Pradesh, we are executing an order of more than Rs. 100 million (USD 2.25 million) which covers Rural Electrification of 400 villages, erection of four new Switchyards of 33/11 KV, 5 MW each and augmentation of seven existing switchyards. We have applied for projects of Power Transmission Line EPC and Erection and Commissioning up to 132 KV. We intend to outsource major electrical equipment and manufacture the structures in-house. We were engaged in the field of 33 KV sub-stations, including control buildings, erection of new sub-stations, upgradation / renovation of existing sub-stations, capacity augmentation of switchyards. Suggestion offered: Suggested to procure Tower Crane model 7050 instead of hiring a mechanical / hydraulic crane for all material handling operations for erection of 300 MW Air Cooled Steam Condensers. Suggested to take minimum 5% stack holding in the power generation company which has given us EPC contract to build two nos biomass based power projects. Suggested to arrange Project Funding through NBFCs (Pricewaterhouse Coopers) at lower interest rate and liberal terms and conditions. | ||
| Previous : |
A Team Leader, GEI Industrial Systems Limited |
|
Worked from 2009 to 2011 | ||
Brief summary :
involves very extensive travelling due to additional responsibilities of Handling Fleet of West Africa and Surrounding Countries of India for Global Service Engineering Business Development. As A Team Leader, Delegating responsibility of establishment and stabilization of a robust team of engineers for providing customer claims/trouble-shooting and management of Services Business. GEI Industrial Systems Limited Since April 2009 to Dec, 2010 Position : Sr.GM-Project Services, Posted at Corporate Office at Bhopal but the work profile involves very extensive travelling due to additional responsibilities of Funding Arrangement and EPC Business Development. Delegated responsibility of establishment of a 300 MW Thermal Power Projects Air Cooled Steam Condenser, which is Indias First Air Cooled Condenser of 350 TPH Steam Flow capacity to be established at Beawar, Rajasthan. Another 350 TPH Steam Flow Capacity Air Cooled Steam Condenser project is at Tuticorin, Tamilnadu for which manufacturing is already under progress. Booked order worth 160 Crore Rs in the first year for EPC of Biomass Based Power Projects and As a Project Head, delegating Execution activities of a 10 MW Biomass Based Thermal Power Project at Burhanpur (MP), and Raipur (CG). Initiated preparation for execution activities of a 10 MW Biomass Based Thermal Power Project at Burhanpur, M.P. Completed Erection, Installation and Commissioning of (18 MW 2 + 6.5 MW ) 44.5 MW Air Cooled Steam Condenser Project at Beawer, Ajmer District, Rajasthan for M/s Shree Cement Limited. Completed Erection, Installation and Commissioning of 50 MW Air Cooled Steam Condenser Project at RAS, Pali District, Rajasthan for M/s Shree Cement Limited. I was a part of an estimation, costing and contracting team executing a Power Transmission Line Project at Bijnor, Uttar Pradesh, we are executing an order of more than Rs. 100 million (USD 2.25 million) which covers Rural Electrification of 400 villages, erection of four new Switchyards of 33/11 KV, 5 MW each and augmentation of seven existing switchyards. We have applied for projects of Power Transmission Line EPC and Erection and Commissioning up to 132 KV. We intend to outsource major electrical equipment and manufacture the structures in-house. We were engaged in the field of 33 KV sub-stations, including control buildings, erection of new sub-stations, upgradation / renovation of existing sub-stations, capacity augmentation of switchyards. Suggestion offered: Suggested to procure Tower Crane model 7050 instead of hiring a mechanical / hydraulic crane for all material handling operations for erection of 300 MW Air Cooled Steam Condensers. Suggested to take minimum 5% stack holding in the power generation company which has given us EPC contract to build two nos biomass based power projects. Suggested to arrange Project Funding through NBFCs (Pricewaterhouse Coopers) at lower interest rate and liberal terms and conditions. | ||
| Previous : |
Senior Manager, RELIANCE GAS TRANSPORTATION INFRASTRUCTURE LIMITED |
|
| BHARUCH | ||
Worked from 2007 to 2011 | ||
Brief summary :
RELIANCE GAS TRANSPORTATION INFRASTRUCTURE LIMITED, BHARUCH Senior Manager - Operations (Jul 2007 To TILL) Reporting to the General Manager and managed 12 employees. Overseeing implementation of a segment (totalized 80 kilometers comprises of spur lines, metering stations, compressor stations, main line valves) of 1370 kilometre, 48 Diameter, Gas Pipeline for Distribution of Natural Gas network comprising total 33 GE make Gas Turbines. Diameter wise, the same is considered to be the largest pipeline in the country. Responsibilities: Making plans and policy of execution and operation of the project, and implementation of the afore-said cross country pipeline. Erection, pre-commissioning, commissioning and operation of cross-country pipeline consisting GE Gas Turbine Compressors. Collecting data, compiling, manpower management, optimisation of resources and planning. Supervising material management and inventory control; carrying out Cost-Benefit Ratio Analysis, training of manpower, enforcing safe operations procedures for gas engine generators, SOPs, SMPs. Helping Purchase Department from time to time in bargaining with bidders by providing proper technical backup. Carrying out technical audit of power generation units with joint participation of all in-house experts. | ||
| Previous : |
Operations Manager, Reliance Gas Transportation And Infrastructure Limited |
|
| Oil & Gas | ||
Worked from 2007 to 2009 | ||
|
Brief summary :
Erection & Commissioning of Gas Compressor Stations, Gas Transmission Cross Country Pipeline. | ||
| Previous : |
Sr.Manager, Infrastructure Limited |
|
| Pune | ||
Worked from 2007 to 2009 | ||
Brief summary :
Reliance Gas Transportation and Infrastructure Limited, Pune, Maharastra July07 - April09 Designation : Sr.Manager Distinction of handling the implementation of a segment of 1370 kilometer, 48 Diameter, Largest (Diameter wise) Gas Pipeline for Distribution of Natural Gas comprises of 33 GE make Gas Turbines (27 PGT25 and 06 Nos GE10/2) from Andhra Pradesh to Gujarat. My segment includes 183 Kilometres Main Pipeline, 44 Kilometers Spur lines, Gas Compressor Station to transport 80 MMSCMD gas coming from KGD6 Basin Reservoir of Reliance which comprises of 03 NPGE Gas Turbine [PGT25] {rotary axial} Compressors [PCL803], Metering and Regulation Stations, 02 Remote MLV Station, 02 Local MLV Station, Plant Utilities like rotary air compressors, RO Plant, Fire Fighting and Gas Detection System, Power Generation (through 03 Nos each of 1.1 MW capacity GE Jenbechre Gas Engines) and Distribution System. To execute a 183 kilometres segment of EWPL (East West Pipeline) project of 48 Diameter natural gas cross country pipeline, I functioned as a Compressor Station HSE Coordinator, Pipeline Coordinator, Main Project Executive for a segment of EWPL, Compressor Station Hand-Over Takeover In Charge, Pipeline Commissioning In Charge, Hydro Test In Charge, Mechanical, Electrical, Instrumentation, SCADA and RTU Integrity Assurance Executive, Control and Protection Logics Counter Checking Executive etc. Administered the entire gamut of 48 Cross Country Gas Pipeline including: ROU Acquisition Pipe Storage Preservation Transportation Loading and Unloading Stringing ROU Clearance Trenching Cathodic Protection Wrapping-Coating Back-Filling Painting Hydro-Testing Cleaning Swabbing Vacuum Drying Calliper Pigging Pipeline Profile Checking by Gauge-Plate Gas-In Activity HAZOPs study for Shell-RGTIL connectivity Line Flushing with Compressed Air Welding (Manual + Automatic welding m/c) Lower-In Sand-Blasting ROU Closure after restoration and NOCs from all external agencies Open Cut and Horizontal Drilling of River/water bodies/highways/railway routes for pipe route. Helium Nitrogen Leak test through third party contractor BJ Services, Dubai for compressor station internal piping. Erection and Commissioning of 1.1 MW, 3 Nos, GE JENBECHR make Gas Engines for power generation. Participated in Erection and Commissioning of 03 Nos, PGT25, NPGE Make Gas Turbines, each 30 MW Capacity. Project Execution of Fire Water System, Drinking and Service Water System of Gas Compressor Station. Drafting and Reviewing SOPs and SMPS for Power Plant Equipments, Gas Compressor Station Equipments, Power Plant Auxiliaries. Pivotal in effectively implementing unmanned Gas Transmission Network Operations through SCADA for this cross country pipeline. Suggestion offered: Suggested TMR [triple module redundancy] for control and protection loop activated by Gas Detector for GE Jenbechre Gas Engines. Instead of Card Board Blasting, suggested full bore air release process for compressor station pipeline cleaning. Removed hydro test water from compressor station piping by pressurizing the entire compressor station piping and siphoning the water. To minimise time of piping integrity and leakage check through Nitrogen-Helium test, suggested pressurization of entire compressor station piping through dry compressed air at 15 Bar pressure. For speedy project execution, double shift initiated for activities like pipeline laying, welding, stringing, trenching etc. With a minimum honorary amount, convinced villagers to be companys informer for any abnormality over the entire stretch of cross country pipeline and due to this level of awareness has increased amongst villagers about cross country pipeline. | ||
| Previous : |
Sr.Manager, Infrastructure Limited |
|
| Pune | ||
Worked from 2007 to 2009 | ||
Brief summary :
Reliance Gas Transportation and Infrastructure Limited, Pune, Maharastra July07 - April09 Designation : Sr.Manager Distinction of handling the implementation of a segment of 1370 kilometer, 48 Diameter, Largest (Diameter wise) Gas Pipeline for Distribution of Natural Gas comprises of 33 GE make Gas Turbines (27 PGT25 and 06 Nos GE10/2) from Andhra Pradesh to Gujarat. My segment includes 183 Kilometres Main Pipeline, 44 Kilometers Spur lines, Gas Compressor Station to transport 80 MMSCMD gas coming from KGD6 Basin Reservoir of Reliance which comprises of 03 NPGE Gas Turbine [PGT25] {rotary axial} Compressors [PCL803], Metering and Regulation Stations, 02 Remote MLV Station, 02 Local MLV Station, Plant Utilities like rotary air compressors, RO Plant, Fire Fighting and Gas Detection System, Power Generation (through 03 Nos each of 1.1 MW capacity GE Jenbechre Gas Engines) and Distribution System. To execute a 183 kilometres segment of EWPL (East West Pipeline) project of 48 Diameter natural gas cross country pipeline, I functioned as a Compressor Station HSE Coordinator, Pipeline Coordinator, Main Project Executive for a segment of EWPL, Compressor Station Hand-Over Takeover In Charge, Pipeline Commissioning In Charge, Hydro Test In Charge, Mechanical, Electrical, Instrumentation, SCADA and RTU Integrity Assurance Executive, Control and Protection Logics Counter Checking Executive etc. Administered the entire gamut of 48 Cross Country Gas Pipeline including: ROU Acquisition Pipe Storage Preservation Transportation Loading and Unloading Stringing ROU Clearance Trenching Cathodic Protection Wrapping-Coating Back-Filling Painting Hydro-Testing Cleaning Swabbing Vacuum Drying Calliper Pigging Pipeline Profile Checking by Gauge-Plate Gas-In Activity HAZOPs study for Shell-RGTIL connectivity Line Flushing with Compressed Air Welding (Manual + Automatic welding m/c) Lower-In Sand-Blasting ROU Closure after restoration and NOCs from all external agencies Open Cut and Horizontal Drilling of River/water bodies/highways/railway routes for pipe route. Helium Nitrogen Leak test through third party contractor BJ Services, Dubai for compressor station internal piping. Erection and Commissioning of 1.1 MW, 3 Nos, GE JENBECHR make Gas Engines for power generation. Participated in Erection and Commissioning of 03 Nos, PGT25, NPGE Make Gas Turbines, each 30 MW Capacity. Project Execution of Fire Water System, Drinking and Service Water System of Gas Compressor Station. Drafting and Reviewing SOPs and SMPS for Power Plant Equipments, Gas Compressor Station Equipments, Power Plant Auxiliaries. Pivotal in effectively implementing unmanned Gas Transmission Network Operations through SCADA for this cross country pipeline. Suggestion offered: Suggested TMR [triple module redundancy] for control and protection loop activated by Gas Detector for GE Jenbechre Gas Engines. Instead of Card Board Blasting, suggested full bore air release process for compressor station pipeline cleaning. Removed hydro test water from compressor station piping by pressurizing the entire compressor station piping and siphoning the water. To minimise time of piping integrity and leakage check through Nitrogen-Helium test, suggested pressurization of entire compressor station piping through dry compressed air at 15 Bar pressure. For speedy project execution, double shift initiated for activities like pipeline laying, welding, stringing, trenching etc. With a minimum honorary amount, convinced villagers to be companys informer for any abnormality over the entire stretch of cross country pipeline and due to this level of awareness has increased amongst villagers about cross country pipeline. | ||
| Previous : |
Sr.Manager, Infrastructure Limited |
|
Worked from 2007 to 2009 | ||
Brief summary :
Reliance Gas Transportation and Infrastructure Limited, Pune, Maharastra July07 - April09 Designation : Sr.Manager Distinction of handling the implementation of a segment of 1370 kilometer, 48 Diameter, Largest (Diameter wise) Gas Pipeline for Distribution of Natural Gas comprises of 33 GE make Gas Turbines (27 PGT25 and 06 Nos GE10/2) from Andhra Pradesh to Gujarat. My segment includes 183 Kilometres Main Pipeline, 44 Kilometers Spur lines, Gas Compressor Station to transport 80 MMSCMD gas coming from KGD6 Basin Reservoir of Reliance which comprises of 03 NPGE Gas Turbine [PGT25] {rotary axial} Compressors [PCL803], Metering and Regulation Stations, 02 Remote MLV Station, 02 Local MLV Station, Plant Utilities like rotary air compressors, RO Plant, Fire Fighting and Gas Detection System, Power Generation (through 03 Nos each of 1.1 MW capacity GE Jenbechre Gas Engines) and Distribution System. To execute a 183 kilometres segment of EWPL (East West Pipeline) project of 48 Diameter natural gas cross country pipeline, I functioned as a Compressor Station HSE Coordinator, Pipeline Coordinator, Main Project Executive for a segment of EWPL, Compressor Station Hand-Over Takeover In Charge, Pipeline Commissioning In Charge, Hydro Test In Charge, Mechanical, Electrical, Instrumentation, SCADA and RTU Integrity Assurance Executive, Control and Protection Logics Counter Checking Executive etc. Administered the entire gamut of 48 Cross Country Gas Pipeline including: ROU Acquisition Pipe Storage Preservation Transportation Loading and Unloading Stringing ROU Clearance Trenching Cathodic Protection Wrapping-Coating Back-Filling Painting Hydro-Testing Cleaning Swabbing Vacuum Drying Calliper Pigging Pipeline Profile Checking by Gauge-Plate Gas-In Activity HAZOPs study for Shell-RGTIL connectivity Line Flushing with Compressed Air Welding (Manual + Automatic welding m/c) Lower-In Sand-Blasting ROU Closure after restoration and NOCs from all external agencies Open Cut and Horizontal Drilling of River/water bodies/highways/railway routes for pipe route. Helium Nitrogen Leak test through third party contractor BJ Services, Dubai for compressor station internal piping. Erection and Commissioning of 1.1 MW, 3 Nos, GE JENBECHR make Gas Engines for power generation. Participated in Erection and Commissioning of 03 Nos, PGT25, NPGE Make Gas Turbines, each 30 MW Capacity. Project Execution of Fire Water System, Drinking and Service Water System of Gas Compressor Station. Drafting and Reviewing SOPs and SMPS for Power Plant Equipments, Gas Compressor Station Equipments, Power Plant Auxiliaries. Pivotal in effectively implementing unmanned Gas Transmission Network Operations through SCADA for this cross country pipeline. Suggestion offered: Suggested TMR [triple module redundancy] for control and protection loop activated by Gas Detector for GE Jenbechre Gas Engines. Instead of Card Board Blasting, suggested full bore air release process for compressor station pipeline cleaning. Removed hydro test water from compressor station piping by pressurizing the entire compressor station piping and siphoning the water. To minimise time of piping integrity and leakage check through Nitrogen-Helium test, suggested pressurization of entire compressor station piping through dry compressed air at 15 Bar pressure. For speedy project execution, double shift initiated for activities like pipeline laying, welding, stringing, trenching etc. With a minimum honorary amount, convinced villagers to be companys informer for any abnormality over the entire stretch of cross country pipeline and due to this level of awareness has increased amongst villagers about cross country pipeline. | ||
| Previous : |
Operations Manager, Reliance Gas Transportation And Infrastructure Limited |
|
| Oil & Gas | ||
Worked from 2007 to 2009 | ||
|
Brief summary :
Erection & Commissioning of Gas Compressor Stations, Gas Transmission Cross Country Pipeline. | ||
| Previous : |
Power Plant Operation Manager, Administered |
|
Worked from 2003 to 2007 | ||
Brief summary :
Aug03 - Jul07 Power Plant Operation Manager Administered the entire gamut of Operation and Operational Support Maintenance Activities of: 2 Nos 10.45 MW NPGE Make Gas Turbines through SUVIMAC - II Control system (similar to Speedtronic Mark V Control System of GE) with an integrated FUJI make DCS System comprises control of Naphtha Fuel Storage, WHRSG. Forwarding and Unloading of liquid fuels in line with safety codes OHSMS, ISO 9001, and ISO 18000 procedure: HSD Fuel Storage, FO Fuel Storage, and Naphtha Fuel Storage [in floating roof tanks]. Relay Ladder Logic, control and understand manpower, Work Circulation, Shift Operations etc. 2 Nos. HRSGs O and M through FUJI DCS, 01 No FBC Boiler Operation through PLC based control system. 01 No. Naphtha fired 37.5 TPH Boiler, 01 No. 37.5 TPH FO Fired Boiler, 20 TPH Agri Waste Based CVL make FBC Boiler. [Compiled the data of Biomass Based FBC Boiler for registration as a CDM project]. 6.5 MW capacity STG of BHEL make through WOODWARD control system. Operation of 66 KV switchyard through remote synchronizing SCADA panel. Suggestion offered: Incorporation of Instrument Air Line into the header of Pulsation Air Compressor Discharge Header. Steam Turbine Tripping from Generator Winding Temperature High High because it was incorporated in the protection loop which was removed and made the arrangement so that only generator breaker will trip in case of Generator winding temperature high high. This has given more availability of Steam Turbine. Earlier, steam turbine was also getting tripped whenever generator winding temperature high high emerged. Raised the DROOP Setpoint from 6% to 8%, resultant steam turbine HP and LP governing valve fluctuations drastically reduced while operating in synchronization with grid. This has reduced trippings of Steam Turbine while operating with Grid and attributed more availability of STG. Commissioning done of FM Boiler over Gas Fuel. Earlier, it was operating over Furnace Oil. During this activity, Furnace Purging Time reduced from 300 Seconds to 180 Seconds. Due to this during emergency, Quick Loading of FM Boiler has been enabled. At Cooling Tower, Induced Draft Fans were of Aluminum Alloy, the same replaced by FRP Fans and achieved 40% auxiliary energy reduction for the CTID Fans. And this attributed high amount of financial benefit in addition to low vibration and thus reduction in maintenance costs too. Modification in CTP (lower capacity) led to a power saving of approx. 1400 unit per day. The Spare CPH was utilized for heating the Feedwater of FBC Process Steam Boiler, which attributed savings of 7000 Kg of fuel (DOC) per day. Out of Four, two BFPs were being utilized for feeding feedwater to 2 Nos HRSGs and One FM Boiler. Revision the set point of autostart of BFP, provided the luxury of feeding both the HRSGs and FM Boiler with only one BFP without any adverse effect over motor. Modification of Instrument Air Compressor leading to power savings of 65,000 units per year. Reduced the diameter of motor pulley from 12 to 10 of instrument air compressors and yearly achieved the auxiliary power consumption reduction to the tune of 41MW. Larsen and Toubro Limited., Rajulacity, Amreli District, Gujarat | ||
| Previous : |
Power Plant Operation Manager, The Arvind Mills Limited |
|
| Ahmedabad | ||
Worked from 2003 to 2007 | ||
Brief summary :
The Arvind Mills Limited, Ahmedabad, Gujarat Aug03 - Jul07 Power Plant Operation Manager Administered the entire gamut of Operation and Operational Support Maintenance Activities of: 2 Nos 10.45 MW NPGE Make Gas Turbines through SUVIMAC - II Control system (similar to Speedtronic Mark V Control System of GE) with an integrated FUJI make DCS System comprises control of Naphtha Fuel Storage, WHRSG. Forwarding and Unloading of liquid fuels in line with safety codes OHSMS, ISO 9001, and ISO 18000 procedure: HSD Fuel Storage, FO Fuel Storage, and Naphtha Fuel Storage [in floating roof tanks]. Relay Ladder Logic, control and understand manpower, Work Circulation, Shift Operations etc. 2 Nos. HRSGs O and M through FUJI DCS, 01 No FBC Boiler Operation through PLC based control system. 01 No. Naphtha fired 37.5 TPH Boiler, 01 No. 37.5 TPH FO Fired Boiler, 20 TPH Agri Waste Based CVL make FBC Boiler. [Compiled the data of Biomass Based FBC Boiler for registration as a CDM project]. 6.5 MW capacity STG of BHEL make through WOODWARD control system. Operation of 66 KV switchyard through remote synchronizing SCADA panel. Suggestion offered: Incorporation of Instrument Air Line into the header of Pulsation Air Compressor Discharge Header. Steam Turbine Tripping from Generator Winding Temperature High High because it was incorporated in the protection loop which was removed and made the arrangement so that only generator breaker will trip in case of Generator winding temperature high high. This has given more availability of Steam Turbine. Earlier, steam turbine was also getting tripped whenever generator winding temperature high high emerged. Raised the DROOP Setpoint from 6% to 8%, resultant steam turbine HP and LP governing valve fluctuations drastically reduced while operating in synchronization with grid. This has reduced trippings of Steam Turbine while operating with Grid and attributed more availability of STG. Commissioning done of FM Boiler over Gas Fuel. Earlier, it was operating over Furnace Oil. During this activity, Furnace Purging Time reduced from 300 Seconds to 180 Seconds. Due to this during emergency, Quick Loading of FM Boiler has been enabled. At Cooling Tower, Induced Draft Fans were of Aluminum Alloy, the same replaced by FRP Fans and achieved 40% auxiliary energy reduction for the CTID Fans. And this attributed high amount of financial benefit in addition to low vibration and thus reduction in maintenance costs too. Modification in CTP (lower capacity) led to a power saving of approx. 1400 unit per day. The Spare CPH was utilized for heating the Feedwater of FBC Process Steam Boiler, which attributed savings of 7000 Kg of fuel (DOC) per day. Out of Four, two BFPs were being utilized for feeding feedwater to 2 Nos HRSGs and One FM Boiler. Revision the set point of autostart of BFP, provided the luxury of feeding both the HRSGs and FM Boiler with only one BFP without any adverse effect over motor. Modification of Instrument Air Compressor leading to power savings of 65,000 units per year. Reduced the diameter of motor pulley from 12 to 10 of instrument air compressors and yearly achieved the auxiliary power consumption reduction to the tune of 41MW. | ||
| Previous : |
Power Plant Operation Manager, The Arvind Mills Limited |
|
| Ahmedabad | ||
Worked from 2003 to 2007 | ||
Brief summary :
The Arvind Mills Limited, Ahmedabad, Gujarat Aug03 - Jul07 Power Plant Operation Manager Administered the entire gamut of Operation and Operational Support Maintenance Activities of: 2 Nos 10.45 MW NPGE Make Gas Turbines through SUVIMAC - II Control system (similar to Speedtronic Mark V Control System of GE) with an integrated FUJI make DCS System comprises control of Naphtha Fuel Storage, WHRSG. Forwarding and Unloading of liquid fuels in line with safety codes OHSMS, ISO 9001, and ISO 18000 procedure: HSD Fuel Storage, FO Fuel Storage, and Naphtha Fuel Storage [in floating roof tanks]. Relay Ladder Logic, control and understand manpower, Work Circulation, Shift Operations etc. 2 Nos. HRSGs O and M through FUJI DCS, 01 No FBC Boiler Operation through PLC based control system. 01 No. Naphtha fired 37.5 TPH Boiler, 01 No. 37.5 TPH FO Fired Boiler, 20 TPH Agri Waste Based CVL make FBC Boiler. [Compiled the data of Biomass Based FBC Boiler for registration as a CDM project]. 6.5 MW capacity STG of BHEL make through WOODWARD control system. Operation of 66 KV switchyard through remote synchronizing SCADA panel. Suggestion offered: Incorporation of Instrument Air Line into the header of Pulsation Air Compressor Discharge Header. Steam Turbine Tripping from Generator Winding Temperature High High because it was incorporated in the protection loop which was removed and made the arrangement so that only generator breaker will trip in case of Generator winding temperature high high. This has given more availability of Steam Turbine. Earlier, steam turbine was also getting tripped whenever generator winding temperature high high emerged. Raised the DROOP Setpoint from 6% to 8%, resultant steam turbine HP and LP governing valve fluctuations drastically reduced while operating in synchronization with grid. This has reduced trippings of Steam Turbine while operating with Grid and attributed more availability of STG. Commissioning done of FM Boiler over Gas Fuel. Earlier, it was operating over Furnace Oil. During this activity, Furnace Purging Time reduced from 300 Seconds to 180 Seconds. Due to this during emergency, Quick Loading of FM Boiler has been enabled. At Cooling Tower, Induced Draft Fans were of Aluminum Alloy, the same replaced by FRP Fans and achieved 40% auxiliary energy reduction for the CTID Fans. And this attributed high amount of financial benefit in addition to low vibration and thus reduction in maintenance costs too. Modification in CTP (lower capacity) led to a power saving of approx. 1400 unit per day. The Spare CPH was utilized for heating the Feedwater of FBC Process Steam Boiler, which attributed savings of 7000 Kg of fuel (DOC) per day. Out of Four, two BFPs were being utilized for feeding feedwater to 2 Nos HRSGs and One FM Boiler. Revision the set point of autostart of BFP, provided the luxury of feeding both the HRSGs and FM Boiler with only one BFP without any adverse effect over motor. Modification of Instrument Air Compressor leading to power savings of 65,000 units per year. Reduced the diameter of motor pulley from 12 to 10 of instrument air compressors and yearly achieved the auxiliary power consumption reduction to the tune of 41MW. | ||
| Previous : |
Power Plant Operation Manager, The Arvind Mills Limited |
|
Worked from 2003 to 2007 | ||
Brief summary :
The Arvind Mills Limited, Ahmedabad, Gujarat Aug03 - Jul07 Power Plant Operation Manager Administered the entire gamut of Operation and Operational Support Maintenance Activities of: 2 Nos 10.45 MW NPGE Make Gas Turbines through SUVIMAC - II Control system (similar to Speedtronic Mark V Control System of GE) with an integrated FUJI make DCS System comprises control of Naphtha Fuel Storage, WHRSG. Forwarding and Unloading of liquid fuels in line with safety codes OHSMS, ISO 9001, and ISO 18000 procedure: HSD Fuel Storage, FO Fuel Storage, and Naphtha Fuel Storage [in floating roof tanks]. Relay Ladder Logic, control and understand manpower, Work Circulation, Shift Operations etc. 2 Nos. HRSGs O and M through FUJI DCS, 01 No FBC Boiler Operation through PLC based control system. 01 No. Naphtha fired 37.5 TPH Boiler, 01 No. 37.5 TPH FO Fired Boiler, 20 TPH Agri Waste Based CVL make FBC Boiler. [Compiled the data of Biomass Based FBC Boiler for registration as a CDM project]. 6.5 MW capacity STG of BHEL make through WOODWARD control system. Operation of 66 KV switchyard through remote synchronizing SCADA panel. Suggestion offered: Incorporation of Instrument Air Line into the header of Pulsation Air Compressor Discharge Header. Steam Turbine Tripping from Generator Winding Temperature High High because it was incorporated in the protection loop which was removed and made the arrangement so that only generator breaker will trip in case of Generator winding temperature high high. This has given more availability of Steam Turbine. Earlier, steam turbine was also getting tripped whenever generator winding temperature high high emerged. Raised the DROOP Setpoint from 6% to 8%, resultant steam turbine HP and LP governing valve fluctuations drastically reduced while operating in synchronization with grid. This has reduced trippings of Steam Turbine while operating with Grid and attributed more availability of STG. Commissioning done of FM Boiler over Gas Fuel. Earlier, it was operating over Furnace Oil. During this activity, Furnace Purging Time reduced from 300 Seconds to 180 Seconds. Due to this during emergency, Quick Loading of FM Boiler has been enabled. At Cooling Tower, Induced Draft Fans were of Aluminum Alloy, the same replaced by FRP Fans and achieved 40% auxiliary energy reduction for the CTID Fans. And this attributed high amount of financial benefit in addition to low vibration and thus reduction in maintenance costs too. Modification in CTP (lower capacity) led to a power saving of approx. 1400 unit per day. The Spare CPH was utilized for heating the Feedwater of FBC Process Steam Boiler, which attributed savings of 7000 Kg of fuel (DOC) per day. Out of Four, two BFPs were being utilized for feeding feedwater to 2 Nos HRSGs and One FM Boiler. Revision the set point of autostart of BFP, provided the luxury of feeding both the HRSGs and FM Boiler with only one BFP without any adverse effect over motor. Modification of Instrument Air Compressor leading to power savings of 65,000 units per year. Reduced the diameter of motor pulley from 12 to 10 of instrument air compressors and yearly achieved the auxiliary power consumption reduction to the tune of 41MW. | ||
| Previous : |
Executive, -O and M |
|
Worked from 1997 to 2003 | ||
Brief summary :
Nov97 - Aug03 Executive-O and M-Power Pivotal in commissioning activities of: Fire Fighting system of Vijay Fire And Protection Systems Limited [Now it is known as Kidde India]. 60 TPH capacity HRSG with R and V, Holland BMS System. 2 Nos. Chicago Pneumatic 2 stage reciprocating instrument / service air compressors. Instrumental in operation of: 50 MW GE Gas turbine based combined cycle power plant. 220 kV switch yard through remote synchronizing panel comprises of CGL designed/supplied 220 kV outdoor switchyard with 11.5 kV/220 kV, 50 MVA and 31.5 MVA Power Transformers with OLTCs, 235 kV SF6 outdoor breakers, Motorized isolators, earthing switches and related equipment. HT Electrical Distribution System comprises of 11 kV and 6.6 kV Voltas / ABB make SF6 indoor type HT Switchgears, Double bus bar system to maximize the available load. Administered the entire gamut of: Procurement activities for the spares of GTG, HSD centrifuges, Air-compressors, Pumps. Integration, Compilation and Updation of DATA for ISO 9001, 14000, OHSAS 18000. Routine maintenance work for a CCPP while GTG was operating in simple cycle mode. Suggestion offered: Incorporation of intermediate filter into fuel forwarding line to reduce the consumption of LP Fuel Filters. Raised the Naphtha Fuel Forwarding Capacity by installing a greater diameter impeller which attributed more margin in Naphtha Pressure Control Valve and attained continuous flow in Naphtha returnline, with low fluctuation in Naphtha Pressure to GTG. Furnace Purging Time reduced from 300 seconds to 120 seconds in HRSG so that HRSG availability increased and therefore STGs availability too. Suggested to incorporate time delay of 20 mili seconds between start up of Fire Water Main Pumps to avoid Gas Turbine tripping due to Sudden Voltage Drop . PREVIOUS ASSIGNMENTS Supreme Services, Ahmedabad | ||
| Previous : |
Executive, Toubro Limited |
|
| Amreli | ||
Worked from 1997 to 2003 | ||
Brief summary :
Larsen and Toubro Limited., Rajulacity, Amreli District, Gujarat Nov97 - Aug03 Executive-O and M-Power Pivotal in commissioning activities of: Fire Fighting system of Vijay Fire And Protection Systems Limited [Now it is known as Kidde India]. 60 TPH capacity HRSG with R and V, Holland BMS System. 2 Nos. Chicago Pneumatic 2 stage reciprocating instrument / service air compressors. Instrumental in operation of: 50 MW GE Gas turbine based combined cycle power plant. 220 kV switch yard through remote synchronizing panel comprises of CGL designed/supplied 220 kV outdoor switchyard with 11.5 kV/220 kV, 50 MVA and 31.5 MVA Power Transformers with OLTCs, 235 kV SF6 outdoor breakers, Motorized isolators, earthing switches and related equipment. HT Electrical Distribution System comprises of 11 kV and 6.6 kV Voltas / ABB make SF6 indoor type HT Switchgears, Double bus bar system to maximize the available load. Administered the entire gamut of: Procurement activities for the spares of GTG, HSD centrifuges, Air-compressors, Pumps. Integration, Compilation and Updation of DATA for ISO 9001, 14000, OHSAS 18000. Routine maintenance work for a CCPP while GTG was operating in simple cycle mode. Suggestion offered: Incorporation of intermediate filter into fuel forwarding line to reduce the consumption of LP Fuel Filters. Raised the Naphtha Fuel Forwarding Capacity by installing a greater diameter impeller which attributed more margin in Naphtha Pressure Control Valve and attained continuous flow in Naphtha returnline, with low fluctuation in Naphtha Pressure to GTG. Furnace Purging Time reduced from 300 seconds to 120 seconds in HRSG so that HRSG availability increased and therefore STGs availability too. Suggested to incorporate time delay of 20 mili seconds between start up of Fire Water Main Pumps to avoid Gas Turbine tripping due to Sudden Voltage Drop . PREVIOUS ASSIGNMENTS | ||
| Previous : |
Executive, Toubro Limited |
|
| Amreli | ||
Worked from 1997 to 2003 | ||
Brief summary :
Larsen and Toubro Limited., Rajulacity, Amreli District, Gujarat Nov97 - Aug03 Executive-O and M-Power Pivotal in commissioning activities of: Fire Fighting system of Vijay Fire And Protection Systems Limited [Now it is known as Kidde India]. 60 TPH capacity HRSG with R and V, Holland BMS System. 2 Nos. Chicago Pneumatic 2 stage reciprocating instrument / service air compressors. Instrumental in operation of: 50 MW GE Gas turbine based combined cycle power plant. 220 kV switch yard through remote synchronizing panel comprises of CGL designed/supplied 220 kV outdoor switchyard with 11.5 kV/220 kV, 50 MVA and 31.5 MVA Power Transformers with OLTCs, 235 kV SF6 outdoor breakers, Motorized isolators, earthing switches and related equipment. HT Electrical Distribution System comprises of 11 kV and 6.6 kV Voltas / ABB make SF6 indoor type HT Switchgears, Double bus bar system to maximize the available load. Administered the entire gamut of: Procurement activities for the spares of GTG, HSD centrifuges, Air-compressors, Pumps. Integration, Compilation and Updation of DATA for ISO 9001, 14000, OHSAS 18000. Routine maintenance work for a CCPP while GTG was operating in simple cycle mode. Suggestion offered: Incorporation of intermediate filter into fuel forwarding line to reduce the consumption of LP Fuel Filters. Raised the Naphtha Fuel Forwarding Capacity by installing a greater diameter impeller which attributed more margin in Naphtha Pressure Control Valve and attained continuous flow in Naphtha returnline, with low fluctuation in Naphtha Pressure to GTG. Furnace Purging Time reduced from 300 seconds to 120 seconds in HRSG so that HRSG availability increased and therefore STGs availability too. Suggested to incorporate time delay of 20 mili seconds between start up of Fire Water Main Pumps to avoid Gas Turbine tripping due to Sudden Voltage Drop . PREVIOUS ASSIGNMENTS | ||
| Previous : |
Executive, Toubro Limited |
|
Worked from 1997 to 2003 | ||
Brief summary :
Larsen and Toubro Limited., Rajulacity, Amreli District, Gujarat Nov97 - Aug03 Executive-O and M-Power Pivotal in commissioning activities of: Fire Fighting system of Vijay Fire And Protection Systems Limited [Now it is known as Kidde India]. 60 TPH capacity HRSG with R and V, Holland BMS System. 2 Nos. Chicago Pneumatic 2 stage reciprocating instrument / service air compressors. Instrumental in operation of: 50 MW GE Gas turbine based combined cycle power plant. 220 kV switch yard through remote synchronizing panel comprises of CGL designed/supplied 220 kV outdoor switchyard with 11.5 kV/220 kV, 50 MVA and 31.5 MVA Power Transformers with OLTCs, 235 kV SF6 outdoor breakers, Motorized isolators, earthing switches and related equipment. HT Electrical Distribution System comprises of 11 kV and 6.6 kV Voltas / ABB make SF6 indoor type HT Switchgears, Double bus bar system to maximize the available load. Administered the entire gamut of: Procurement activities for the spares of GTG, HSD centrifuges, Air-compressors, Pumps. Integration, Compilation and Updation of DATA for ISO 9001, 14000, OHSAS 18000. Routine maintenance work for a CCPP while GTG was operating in simple cycle mode. Suggestion offered: Incorporation of intermediate filter into fuel forwarding line to reduce the consumption of LP Fuel Filters. Raised the Naphtha Fuel Forwarding Capacity by installing a greater diameter impeller which attributed more margin in Naphtha Pressure Control Valve and attained continuous flow in Naphtha returnline, with low fluctuation in Naphtha Pressure to GTG. Furnace Purging Time reduced from 300 seconds to 120 seconds in HRSG so that HRSG availability increased and therefore STGs availability too. Suggested to incorporate time delay of 20 mili seconds between start up of Fire Water Main Pumps to avoid Gas Turbine tripping due to Sudden Voltage Drop . PREVIOUS ASSIGNMENTS | ||
| Previous : |
Site Supervisor, The Venus Engineering Company |
|
| Ahmedabad | ||
Worked from 1996 to 1997 | ||
Brief summary :
Apr96 - Nov97 Site Supervisor The Venus Engineering Company, Ahmedabad | ||
| Previous : |
Site Supervisor, Supreme Services |
|
| Ahmedabad | ||
Worked from 1996 to 1997 | ||
Brief summary :
Supreme Services, Ahmedabad Apr96 - Nov97 Site Supervisor | ||
| Previous : |
Site Supervisor, Supreme Services |
|
| Ahmedabad | ||
Worked from 1996 to 1997 | ||
Brief summary :
Supreme Services, Ahmedabad Apr96 - Nov97 Site Supervisor | ||
| Previous : |
Site Supervisor, Supreme Services |
|
Worked from 1996 to 1997 | ||
Brief summary :
Supreme Services, Ahmedabad Apr96 - Nov97 Site Supervisor | ||
| Previous : |
QC Supervisor, The Venus Engineering Company |
|
| Ahmedabad | ||
Worked from 1993 to 1996 | ||
Brief summary :
The Venus Engineering Company, Ahmedabad Sep93 - Apr96 QC Supervisor | ||
| Previous : |
QC Supervisor, The Venus Engineering Company |
|
| Ahmedabad | ||
Worked from 1993 to 1996 | ||
Brief summary :
The Venus Engineering Company, Ahmedabad Sep93 - Apr96 QC Supervisor | ||
| Previous : |
QC Supervisor, The Venus Engineering Company |
|
Worked from 1993 to 1996 | ||
Brief summary :
The Venus Engineering Company, Ahmedabad Sep93 - Apr96 QC Supervisor | ||
Sponsored Jobs
Featured Career Adviser

Leading Recruitment Firm
- Create a confidential Career Profile and Resume/C.V. online
- Get advice for planning their career and for marketing of experience and skills
- Maximize awareness of and access to the best career opportunities
shailendra's communities
|
7258 members, 156 jobs, 187 articles, 128 questions, 252 debates, 133 idea contests.
|
|
3059 members, 98 jobs, 299 articles, 110 questions, 223 debates, 110 idea contests.
|
|
890 members, 146 jobs, 74 articles, 44 questions, 46 debates, 39 idea contests.
|
shailendra's
contributions
Yes I do agree but still I would like to remain positive believe that we the greatest force of this country can act in constructive way yield exceptional results. Let's take the example of power domain. The Greatest thing we must do is decouple the... |
Well, with due respect I would like to add few things which I understand to watch on...That's to alleviate the interest of end use in renewable power this can be made by proper syndication of end user, power distribution entity, power transmission... |
I completely agree with you. But the reason is different. Most of the investors use conventional wind turbines [horizontal axis] but I advocate for vertical axis aerogenerators which are very efficient operates at low wind speeds like 0.8 m/s to 9 m/s... |
I agree. This will really increase the production as well as more genuine parties would start investing who really wants to be in the business of renewable energy based power generation. Till time, government subsidies, tax benefits were the... |
Sir, With due respect, I disagree. Because these babus are part of our people they have been elected by our people so we always have opportunity to throw unwanted people OUT. Any way, I advocate for such ideas which can be simple to execute effective.... |
Related Topics
Discuss the current market trends, evolving markets, and growth prospects...
1 trends
, 1 insight
, 6 debates
, 3 idea contests
, 6 question
As power generation technologies grow more sophisticated, control strategies...
1 insight
, 1 debates
, 3 question
Environmental pollution is a problem both in developed and developing...
1 trends
, 3 insight
, 17 debates
, 7 idea contests
, 5 question
Viewers also viewed
|
(100 Points)
|
|
(50 Points)
|