Build your professional network on facebook via our app Go to app
shreedhar sr.quality control engg, GCC
 
shreedhar's Profile
shreedhar
sr.quality control engg, GCC
GCC
confidential
confidential
doha, Qatar
Toostep 
Professional summary
shreedhar's Experience
Current :

sr.quality control engg, GCC

Construction
Qatar
 
 
 
 
shreedhar's communities
25987 members, 211 jobs, 568 articles, 570 questions, 621 debates, 368 idea contests.
shreedhar's contributions
Hello,   I do agree with Mr. Venkatesh, also i want to add some points. The soil investigation has to be made correctly and all structural designs shall impliment all the datas preiscribed by the SIR(Soil Investigation Report). But i india most...
Hello,      I do agree however the codes are the specific path to exicute in systimatic and compliance to international standards. Shreedhar.
The main priority to start the projectis. 1. Proper planning and adhere to it. 2. Selction of subcontractor shall be based on the all technical adviser rather than papers/documents. 3 Safety and Qualiy standards must be impliment. 4. Unwanted presure...
Well Mr.Chandramouli,      This is the right time to ask this question. The main aspect is the avioding the quality management system in the constructions, like prior to start the job quality has to monitor the construction programe instead of the...
Thanks for your well refreshing the world. this filmis realy worth to see and implimantaion in life leads to dramatic changes. Ultimatley he demonstrated the use of vacum cleaner to the worthfull sence. Shreedhar.
 
Related Topics
BPM is critical to make sure the system delivers a quality service while...
1 insight , 1 debates , 3 idea contests , 1 question  
Manufacturers across a wide range of industries face many common challenges...
2 trends , 5 insight , 11 debates , 6 idea contests , 10 question  
Manufacturing process control and quality assurance are elements of a...
4 idea contests