It will be good for students. As they will be able to prepare for their exams accordingly.
|
|
|
|
Sibasis Dash
| Argues in support of
| 10 months ago
|
|
Be prepared before exam. Don't wait for the schedule
|
|
|
|
Sheetal Bhandari
| Argues in support of
"Yes"
| 10 months ago
|
|
This is a good idea for the students as they will know how to plan their studies. Planning well in advance gives you lots of room for understanding. For few it would not be good because there are students who can perform better under stress.. :)
|
|
Debate: "Giving out exam schedule well in advance " deleted from your view.
|
(rate this)
|
|
Yes
|
24
|
VS |
65
|
No
|
|
|
Balram Vakil
| Argues in support of
"Yes"
| 6 days ago
|
|
It's not like we are discriminating women....it's just we r avoiding unwanted circumstances!!! u accept or not, there can never be 100% secured nation/state/city nor we can make one...
|
|
|
|
Sibasis Dash
| Argues in support of
| 11 months ago
|
|
In my opinion all r equal but we and women also be cautious about safety of women.
|
|
|
|
Sheetal Bhandari
| Argues in support of
"No"
| 11 months ago
|
|
Most of these rules are implied with a tag called "immoral" .. why?? Why can't a woman work. If you are talking about their security then shouldn't you impose rules which take care of their security instead taking away the freedom??
|
|
Debate: "Women should be barred from working at night : Do you agree?" deleted from your view.
|
(rate this)
|
|
All have equal responsibility based on delay analysis
|
13
|
VS |
3
|
Only Contractor is responsible
|
|
|
Rajendran Mariagnanam Mariagnanam
| Argues in support of
"All have equal responsibility based on delay analysis"
| 7 months ago
|
|
The agreement clauses framed by the client with the contractor, and consultant maters most in execution of the project.if agreement caters of all accountable person other than contractor in the agreement then the float can be the contractor...
|
|
|
|
Sibasis Dash
| Argues in support of
| 11 months ago
|
|
All are equal responsibility. But i think most responsibility is from client side.
|
|
|
|
Rinu P Babu
| Argues in support of
"All have equal responsibility based on delay analysis"
| 11 months ago
|
|
Proper analysis should done based on progress reports. and should find out who made critical delays
|
|
Debate: "Who will occupy float in a project? Client, Consultant or Contractor?" deleted from your view.
|
(rate this)
|
1
Water-cementitious materials ratio
2
Its not a fair quesion..common
|
|
Vivek Singh
| Supported idea
"Making good concrete is more of art than science"
| 2 years ago
|
|
I agree that concrete making is an art, but based upon the knowledge of its science. A good concrete design must be started with proper calculations and then adjusted according to inferences drawn both by tests and visual observations. For...
|
|
|
|
Sibasis Dash
| Added idea
| 2 years ago
|
|
According to the strength required suitable proportion of w/c ratio is required to increase the strength & durability.
|
|
Ideate: "What are recommended mix proportions for good concrete?" deleted from your view.
ddsdsdsdsd
Job: "Civil Engineer-Other, acdasdas, bhubaneswar" deleted from your view.
|
(rate this)
|
|
|
Vivek Singh
| Answered
| 2 years ago
|
|
Sorry Sibasis the question is not very clear. A pure technical question after a long time...please make it clearer by better elaboration
|
|
Answer: "PSC Box Girder" deleted from your view.
|
(rate this)
|
|
Brick/stone masonry is better
|
14
|
VS |
19
|
Concrete hollow blocks masonry is superior
|
|
|
Vikram Kothari
| Argues in support of
"Concrete hollow blocks masonry is superior"
| 10 months ago
|
|
IN HCB BLOCKS, LESS MORTAR CONSUMPTION, REDUCED A/C POWER CONSUPTION MEANS BETTER INSULATION IN TEMPERATE ZONES, SAVINGS IN PLASTERS, REDUCTION IN CONCRETE & STEEL IN FRAME STRUCTURE. THE MAKING OF HCB NEEDS HIGH QUALITY PRECISION MACHINES ARE...
|
|
|
|
Sibasis Dash
| Argues in support of
| 2 years ago
|
|
According to me concrete hollow blocks masonary is superior but after thinking to the comments by Anjali sinha i am changing my views.
|
|
|
|
Anjali Sinha
| Argues in support of
"Brick/stone masonry is better"
| 2 years ago
|
|
According to me if you are thinking about safety and life of the wall, then the brick wall is the better choice than hollow block wall, because the hollow block wall is not strong as a brick wall, others may not agree with me on this but i am...
|
|
Debate: "Concrete hollow blocks v/s brick or stone masonry" deleted from your view.
|
(rate this)
|
The resources chosen for a project determine/influence how quickly a project could be completed. To find the right resources for a project Four elements should be examined for each resource. MAINTAINABILITY REPLACEMENT DIVERSITY DISPOSAL MAINTAINABILITY : Resources should be easily maintainable. If an Employee has to stop for every 15 Minutes to unclog a machine, The PRODUCTIVITY AND PROGRESS is hindered. REPLACEMENT : Resources should be replaceable with minimal expense. Here Quality Trade off should be considered between Low end Low cost resources vs High End High Cost Resources. For Customer Quality is the Major Constraint then High End Expensive Resources should be chosen. DIVERSIT...
|
|
Sibasis Dash
| Commented
| 3 years ago
|
|
i think this comment is very useful to me.
|
|
|
|
SHIVENDRA KUMAR JHA
| Commented
| 3 years ago
|
|
Nice one. Please keep on sending such articles to me. regds jha
|
|
Insight: "ELEMENTS TO CONSIDER FOR EFFECTIVE RESOURCE PLANNING" deleted from your view.
|
(rate this)
|
Answer: "How resource planning will be done through MS Project or Primavera?" deleted from your view.
|
(rate this)
|
i wanted to know which type of foundation is advisable in sea sand soil?
|
|
kamalakannan
| Answered
| 2 years ago
|
|
The raft and pile foundation are the most used for sea shore,but well foundation is also a good one but it is always ignored because of lack of knowledge about it.However the choice can be made on knowing abt the size and type of building.
|
|
|
|
Vivek Singh
| Answered
| 2 years ago
|
|
.....when in doubt pile through the earth
|
|
|
|
Sibasis Dash
| Answered
| 3 years ago
|
|
Raft foundation is good enough for sea sand soil but it has to be sure that no construction joints are present.
|
|
Answer: "what is the foundation pattern advisable for the construction on the sea shore beach sandy soil?" deleted from your view.