Build your professional network on facebook via our app Go to app
Sibasis Dash Project Co-ordinator, Feedback Infrastructure Services Pvt. Ltd.
 
Create knowledge [?]
 
(rate this)
Yes 
23
VS
2
 No
Srishti Bansal  |  Argues in support of  "Yes"  |  10 months ago
It will be good for students. As they will be able to prepare for their exams accordingly.
Sibasis Dash  |  Argues in support of  |  10 months ago
Be prepared before exam. Don't wait for the schedule
Sheetal Bhandari  |  Argues in support of  "Yes"  |  10 months ago
This is a good idea for the students as they will know how to plan their studies. Planning well in advance gives you lots of room for understanding. For few it would not be good because there are students who can perform better under stress.. :)
 support: 
 
 
Debate: "Giving out exam schedule well in advance " deleted from your view.
Undo
 
(rate this)
Yes 
24
VS
65
 No
Balram Vakil  |  Argues in support of  "Yes"  |  6 days ago
It's not like we are discriminating women....it's just we r avoiding unwanted circumstances!!! u accept or not, there can never be 100% secured nation/state/city nor we can make one...
Sibasis Dash  |  Argues in support of  |  11 months ago
In my opinion all r equal but we and women also be cautious about safety of women.
Sheetal Bhandari  |  Argues in support of  "No"  |  11 months ago
Most of these rules are implied with a tag called "immoral" .. why?? Why can't a woman work. If you are talking about their security then shouldn't you impose rules which take care of their security instead taking away the freedom??
 support: 
 
 
Debate: "Women should be barred from working at night : Do you agree?" deleted from your view.
Undo
 
(rate this)
All have equal responsibility based on delay analysis 
13
VS
3
 Only Contractor is responsible
Rajendran Mariagnanam Mariagnanam  |  Argues in support of  "All have equal responsibility based on delay analysis"  |  7 months ago
The agreement clauses framed by the client with the contractor, and consultant maters most in execution of the project.if agreement caters of all accountable person other than contractor in the agreement then the float can be the contractor...
Sibasis Dash  |  Argues in support of  |  11 months ago
All are equal responsibility. But i think most responsibility is from client side.
Rinu P Babu  |  Argues in support of  "All have equal responsibility based on delay analysis"  |  11 months ago
Proper analysis should done based on progress reports. and should find out who made critical delays
 support: 
 
 
Debate: "Who will occupy float in a project? Client, Consultant or Contractor?" deleted from your view.
Undo
 
(rate this)
1 Water-cementitious materials ratio
2 Its not a fair quesion..common
Vivek Singh  |  Supported idea  "Making good concrete is more of art than science"  |  2 years ago
I agree that concrete making is an art, but based upon the knowledge of its science. A good concrete design must be started with proper calculations and then adjusted according to inferences drawn both by tests and visual observations. For...
Sibasis Dash  |  Added idea  |  2 years ago
According to the strength required suitable proportion of w/c ratio is required to increase the strength & durability.
 
 
Ideate: "What are recommended mix proportions for good concrete?" deleted from your view.
Undo
 
 
Job: "Civil Engineer-Other, acdasdas, bhubaneswar" deleted from your view.
Undo
 
 
(rate this)
Vivek Singh  |  Answered  |  2 years ago
Sorry Sibasis the question is not very clear. A pure technical question after a long time...please make it clearer by better elaboration
 
 
Answer: "PSC Box Girder" deleted from your view.
Undo
 
(rate this)
Brick/stone masonry is better 
14
VS
19
 Concrete hollow blocks masonry is superior
Vikram Kothari  |  Argues in support of  "Concrete hollow blocks masonry is superior"  |  10 months ago
IN HCB BLOCKS, LESS MORTAR CONSUMPTION, REDUCED A/C POWER CONSUPTION MEANS BETTER INSULATION IN TEMPERATE ZONES, SAVINGS IN PLASTERS, REDUCTION IN CONCRETE & STEEL IN FRAME STRUCTURE. THE MAKING OF HCB NEEDS HIGH QUALITY PRECISION MACHINES ARE...
Sibasis Dash  |  Argues in support of  |  2 years ago
According to me concrete hollow blocks masonary is superior but after thinking to the comments by Anjali sinha i am changing my views.
Anjali Sinha  |  Argues in support of  "Brick/stone masonry is better"  |  2 years ago
According to me if  you are thinking about  safety and life of the wall, then the brick wall is the better choice  than hollow block wall, because the hollow block wall is not strong as a brick wall, others may not agree with me on this but i am...
 support: 
 
 
Debate: "Concrete hollow blocks v/s brick or stone masonry" deleted from your view.
Undo
 
(rate this)
The resources chosen for a project determine/influence how quickly  a project could be completed. To find the right resources for a project Four elements should be examined for each resource. MAINTAINABILITY REPLACEMENT DIVERSITY DISPOSAL MAINTAINABILITY :  Resources should be easily maintainable. If an Employee has to stop for every 15 Minutes to unclog a machine, The PRODUCTIVITY AND PROGRESS is hindered. REPLACEMENT : Resources should be replaceable with minimal expense. Here Quality Trade off should be considered between Low end  Low cost  resources vs High End  High Cost Resources. For Customer Quality is the Major Constraint then High End Expensive Resources should be chosen. DIVERSIT...
Sibasis Dash  |  Commented  |  3 years ago
i think this comment is very useful to me.
SHIVENDRA KUMAR JHA  |  Commented  |  3 years ago
Nice one. Please keep on sending such articles to me. regds jha
 
 
Insight: "ELEMENTS TO CONSIDER FOR EFFECTIVE RESOURCE PLANNING" deleted from your view.
Undo
 
 
Answer: "How resource planning will be done through MS Project or Primavera?" deleted from your view.
Undo
 
(rate this)
i wanted to know which type of foundation is advisable in sea sand soil?
kamalakannan  |  Answered  |  2 years ago
 The raft and pile foundation are the most used for sea shore,but well foundation is also a good one but it is always ignored because of lack of knowledge about it.However the choice can be made on knowing abt the size and type of building.
Vivek Singh  |  Answered  |  2 years ago
.....when in doubt pile through the earth
Sibasis Dash  |  Answered  |  3 years ago
Raft foundation is good enough for sea sand soil but it has to be sure that no construction joints are present.
 
 
Answer: "what is the foundation pattern advisable for the construction on the sea shore beach sandy soil?" deleted from your view.
Undo
View more   
Follow me on
TooStep
 
 
Contributions and Connections
 
 
169 Contribution Points
0
0 Expert Badges
[?]
19
Connections
20
Following
13
Followers
[?]