suraj singh's Profile
suraj singh's Experience
| Current : |
Construction planning n management, OSE |
|
| Construction | ||
| India, Agra | ||
Working from 2007 | ||
|
Brief summary :
Construction four laning Agra Bharatpur section of NH-11, responsible for pavement works. | ||
| Previous : |
PM, MBL |
|
| Construction | ||
| India, New Delhi | ||
Worked from 2005 to 2006 | ||
|
Brief summary :
Management of comprehensive maintenance of Ring Road | ||
suraj singh's Education
Institution of Engineers(India), Kolkata |
|
| B.Tech/B.E. | |
| India | |
| From 1996 to 2001 | |
Sponsored Jobs
Featured Career Adviser

Leading Recruitment Firm
- Create a confidential Career Profile and Resume/C.V. online
- Get advice for planning their career and for marketing of experience and skills
- Maximize awareness of and access to the best career opportunities
suraj's communities
|
35952 members, 590 jobs, 1219 articles, 574 questions, 1505 debates, 422 idea contests.
|
|
25984 members, 211 jobs, 568 articles, 570 questions, 621 debates, 368 idea contests.
|
|
2803 members, 55 jobs, 122 articles, 54 questions, 80 debates, 50 idea contests.
|
suraj's
contributions
I think this is very impotant to build light efficient houses today. Doing this we,ll be saving on materials which will contribute in environment conservation. |
GSB's main roles are:- Load bearing/distribution Drainage: water find way through GSB voids towards slope under gravitational force. Subgrade, GSB and all pavement layers are constructed always in slope to facilitate drainage. Water may enter... |
Simple,Grade is based on the 28 days strength of cement when tested as per Indian Standards under standard conditions. If it is 33-grade cement then it has strength equivalent to 33 MPa (330 kg/cm2). Similarly 43 53 grades can be defined. It is neither... |
Funny to note that Metal buildings are heat-resistant. It is only due to insulation not metal. Metal building is advantageous over brick/cement/concrete in case of earthquake. |
I've observed seven rubber tyres gone worn out or lived out during last 10 months on rolling hot asphalt works. Total qty 400000 Sqm DBM only. Rolling temperature is maintained as required in MORT H specfn(115-135). |
Related Topics
An IT project manager is a professional in the field of project management....
3 insight
, 3 debates
, 6 idea contests
, 8 question
Nowadays people are speaking about going green and sustainability in...
2 insight
, 3 debates
, 5 idea contests
, 6 question
Nearly 70 percent of IT projects are dogged by cost-overruns or aren't...
5 insight
, 3 debates
, 8 idea contests
, 5 question
Viewers also viewed
|
2
(736 Points)
|
|
11
(3,154 Points)
|
|
(55 Points)
|





