Posted in Community :
Manufacturing & Engineering Professionals |
Construction Planning & Management |
Project Management ++ |
34 more ...
Smart construction engineering
Tags :
construction engineering, construction engineering techniques, construction productivity, productivity measurement, labor productivity, production productivity, communication techniques, quality improvement, productivity management, improvement process, training techniques, business productivity, work construction, construction, construction management, performance improvement,
Industry :
construction
Functional Area : Productivity and performance |
|
|
Follow this Topic |
more actions >>
|
About "Smart construction engineering" topic:
Construction engineering - Here we will cover important topics of productivity improvement (a hot topic in today's construction industry). Topics discussed include site management, construction engineering, productivity (improved studies, human factors, economics, safety and environmental health).
4 trends
, 3 insight
, 9 debates
, 15 idea contests
, 8 question
on topic: "Smart construction engineering"
|
(rate this)
|
1
Certified Skilled Labour.
2
Develop a Virtual Model early
|
|
Prashanta Bhaumik
| Supported idea
" Certified Skilled Labour."
| 1 year ago
|
|
I know L&T Ecc practices the Skill upgradation thru skill training institutes. But the problem is return on those effort is miniscule as business proposition apart from maintaining Corporate Social responsibility.Construction Echo system is...
|
|
|
|
neelakshi
| Supported idea
"Develop a Virtual Model early"
| 2 years ago
|
|
Agree with Krishna completely. Way to Lean Construction is Lean BIM from start to end .
|
|
|
|
srinivasalu. chintamani
| Supported idea
" Certified Skilled Labour."
| 4 years ago
|
|
it is always better to have the certified skilled labour for all the construction purpose, but way of delivering the end product with quality on time is very important, also let us not entertain the fake certified skilled labour at any cost.
|
|
Ideate: "How to implement Lean Construction effectively ?" deleted from your view.
|
(rate this)
|
1
Best Scheduling Technique - A Myth!!!
2
PRIMEVERA
|
|
rakeshbhatnagar
| Added idea
"plenty of scheduling technics are available but a sucessfull schedule related to practical approch is not available."
| 2 years ago
|
|
There are plenty of methods available but non of them are sucessfull in practical life as the targets must be achivable. your dependency is over the men power which will work as he wish, that will be the time required to finish the activity.So all...
|
|
|
|
Dipak Bhattacharya
| Supported idea
"Use of the Last Planner System"
| 2 years ago
|
|
Ankit, there has to be an overall target and/or a criteria of approach first, otherwise how and what shall you plan fortnightly?There has to be an ideal objective first.Let client speak out or the circumstances determine what is or what should be...
|
|
|
|
Ashutosh Maurya
| Supported idea
"Best Scheduling Technique - A Myth!!!"
| 2 years ago
|
|
I totally disagree with Nitin. If Primavera or (any CPM based software) is not working at your organization that is the problem of the organization or the group you are working with. I have planned and executed the project with extensive use of...
|
|
Ideate: "Best Scheduling Techniques in Construction Projects." deleted from your view.
|
(rate this)
|
The National Productivity Council is organising a residential training programme on Lean Management in Construction in Poovar Island resort near trivandrum from 12th to 15 August 2009. Those desiring to attend or nominate participants may send enquiries to bngnpc@vsnl.net or ml.suryaprakash@npcindia.org
Trends: "Training Programme on Lean Management in Construction" deleted from your view.
|
(rate this)
|
|
It is possible
|
30
|
VS |
8
|
It is not possible
|
|
|
KUMAR SAURABH JHA
| Argues in support of
"It is possible"
| 2 years ago
|
|
Sound planning and execution
|
|
|
|
Pragya Kothari
| Argues in support of
"It is not possible"
| 4 years ago
|
|
I somewhat agree with you but there are certain sites or places where it is not possible to take our PCs feed all information in it.
|
|
|
|
PUGHALENDHI R
| Argues in support of
"It is not possible"
| 4 years ago
|
|
First, the civil engineers should come out from the old technologies, and get awareness about the new technology. Every civil engineers must have the knowledge of computer oriented. The Engineers in project site oriented [except planning billing...
|
|
Debate: "how will reduce the paper work at project sies" deleted from your view.
|
(rate this)
|
1
tips to improve construction process
2
Provide incentive to adopt better technology
|
|
Brajesh Mishra
| Supported idea
" In construction process man,material,money ,time and technology are 5 parameter"
| 2 years ago
|
|
The most important part of the project management of any project is proper realistic Planning by an experienced person based on past experiences of similar nature projects.Then scheduling controlling into the play. Assigning resorces and...
|
|
|
|
sureshkumar
| Supported idea
"Construction Management"
| 2 years ago
|
|
It is a main thing before commencing the project.
|
|
|
|
sureshkumar
| Supported idea
"tips to improve construction process"
| 2 years ago
|
|
Naturally home town works are better than high raised industrial buiidings.Is it?
|
|
Ideate: "Tips to improve Construction Process." deleted from your view.
|
(rate this)
|
Debate: "constuction" deleted from your view.
|
(rate this)
|
|
yes it is feasible and necessary
|
13
|
VS |
5
|
It is not possible to mechanize all activities fully
|
|
|
rakeshbhatnagar
| Argues in support of
"yes it is feasible and necessary"
| 2 years ago
|
|
Yes , It has already entered the construction field in the form of CRAIN,BATCHING PLAT, CONCRETE BOOM PLACER nd many other tools are as good as the robotics. In this some are semi - automatic and automatic .
|
|
|
|
Atul Joshi
| Argues in support of
"It is not possible to mechanize all activities fully"
| 3 years ago
|
|
Robotics is possible when operating parameters are constant, now latest thinking robots are coming but for construction industry I doubt it. However mechanization has been done in the construction industry to a great extent
|
|
|
|
vyom sahu
| Argues in support of
"yes it is feasible and necessary"
| 3 years ago
|
|
Yes it is possible and required too. as labour dependency is to reduce and increase the productivity Robotics is required. In order to make it possible we can go semi automatic option in small less productive works. We can combine dependency of...
|
|
Debate: "Is robotics in construction feasible" deleted from your view.
|
(rate this)
|
|
using timber shuttering
|
1
|
VS |
1
|
using steel shuttering
|
|
|
rakeshbhatnagar
| Argues in support of
"using timber shuttering "
| 2 years ago
|
|
While using timber shuttering its easier to fit in sizes,where as in steel shuttering beams are to be made of timber and ply wood,because the beam depth and width vary depending over the design criteria.If we use good quality of timber and ply...
|
|
|
|
Sunil Omprakash Bhutada
| Argues in support of
"using steel shuttering"
| 3 years ago
|
|
use of steel shuttering provide good speed in construction
|
|
Debate: "how to improve the cycle time without westing shuttering material" deleted from your view.
|
(rate this)
|
1
Equip professionals with modern management tools through training
|
|
Biranchi Narayan Acharya
| Added idea
"Equip professionals with modern management tools through training"
| 3 years ago
|
|
Many engineers workers work in a conventional stereotype system that yield less production. They need to be equipped with latest management tools.workers need to be equipped with latest skills. Thiscan be rendered through periodic scientific...
|
|
Ideate: "How do the productivity of professionals & workers of India can be increased" deleted from your view.
|
(rate this)
|
1
Proper thermal analysis
2
Using thermocol
|
|
Biswajit Sarma
| Supported idea
"Proper thermal analysis"
| 2 years ago
|
|
Its a very good description of the subject. We are very much concerned on the heat of hydration and the most accepted and easiest way is the replacement of cement either with Fly-Ash or GGBFS to as much as 55%. This not only results good quality...
|
|
|
|
Amarendra Dheer
| Supported idea
"ice "
| 2 years ago
|
|
Takiling about Thermocol insulation: Thermocl line on outer surface only, is possible but with a thin metalic sheet as an integrated part of the drum. It will ensure your company signatures etc. But, this will increase the cost load on the chasis...
|
|
Ideate: "Controlling concrete temperature" deleted from your view.
Other knowledge matching "Smart construction engineering" topic
|
Activity:
4 referals
,
3 comments,
747 views
|
|
|
In world of financial engineering , I have this information to share with you . Well the financial risks could be averted by adopting these measures . Have a look at these measures and you will know ..... The concept of livelihood insurance, where contracts will protect individuals from long-term economic risks such as the loss of a paycheck or the depreciation of one's home value. The concept of what he terms "macro markets" - where individuals, corporations, and governments alike can trade or hedge risks associated with the fluctuations in GDP or national incomes. The concept of income-linked loans - where lenders will make loans to governments, corporations or individuals whose repayment terms are tied to the incomes of these entities. Such repayment terms could be a certain percentage of one's income, which would cause the outstanding balance to decline if income levels decline. This would reduce the change of bankruptcies but will also alleviate our fears of taking more risks...
|
|
Activity:
11 referals
,
2 comments,
319 views
|
|
|
Neural networks in financial engineering Neural networks have shown considerable successes in modeling financial data series. However, a major weakness of neural modeling is the lack of established procedures for performing tests for misspecified models, and tests of statistical significance for the various parameters that have been estimated. This is a serious disadvantage in applications where there is a strong culture for testing not only the predictive power of a model or the sensitivity of the dependent variable to changes in the inputs but also the statistical significance of the finding at a specified level of confidence. Rarely is this more important than in the case of financial engineering, where the data generating processes are dominantly stochastic and only partially deterministic. Partly a tutorial, partly a review, this paper describes a collection of typical applications in options pricing, cointegration, the term structure of interest rates and models of...
|
|
Activity:
4 referals
,
2 comments,
419 views
|
|
|
Financial engineering has provided innumerable lucrative opportunities for otherwise indigent mathematicians Nevertheless the turbulence in the bond markets in the last couple of months, at a time when the world economy’s prospects seemed set fair, have exposed a guilty secret of the financial engineering profession: its methods don’t work. First area of failure is liquidity. Theoretically, if financial engineers design ever fancier artificial securities and derivatives, but everybody uses the same mathematical models to value them, there is no reason why an active market should not operate in the securities, at whatever price the models direct. In practice this only works in calm markets. In times of market turbulence, when doubts arise about either the mathematical models themselves or the underlying assets from which value is derived, the true value of these artificial assets becomes thoroughly unclear. Buyers assess their value at the lowest possible level, and refuse to...
|
|
Activity:
0 referals
,
1 comments,
336 views
|
|
|
Q4 Construction/Contracting SBRB Industry Report: Construction, Contracting Business Owners Expect Economy to Improve Throughout the Next 12 Months Small Business Research Board Study Indicates Construction, Contracting Business Owners Are Satisfied With Principal Lenders BUFFALO GROVE, IL--(Marketwire - March 9, 2009) - Owners of construction and contracting businesses have an improved outlook for the general economy during the next 12 months as the Small Business Research Board (SBRB) said its Small Business Confidence Index (SBCI) increased slightly during the fourth quarter. The construction and contracting industry reported an SBCI of 34 during the fourth quarter, a three point increase from the 31 recorded during the second quarter of 2008, according to the study co-sponsored by IPA. The fourth quarter 2008 SBCI is set at 36 and is six points above the indicator's historical low of 30 recorded during the second quarter of 2008. The current industry SBCI is three points higher...
|
|
Activity:
0 referals
,
16 comments,
685 views
|
|
|
Industrial production shrinks by 2% as compared to the previous years 8% despite a stimulus package announced by the government to boost sagging demand. The manufacturing sector, which has a weight of about 80 per cent in the Index of Industrial Production (IIP), registered negative growth of 2.5 per cent against a rise of 8.6 per cent in December 2007. The production of consumer durables and consumer non-durables as well as intermediate items declined. Consumer durables production fell as much as 12.8 per cent. For the first nine months of the current fiscal, industrial growth stood at 3.2 per cent against 9 per cent a year ago. The official advance estimates released earlier this week pegged industrial growth at 4.8 per cent for the current fiscal.
|

People Matter,Results Count
- Create a confidential Career Profile and Resume/C.V. online
- Get advice for planning their career and for marketing of experience and skills
- Maximize awareness of and access to the best career opportunities
Recent Knowledge in Topic (27)
|
|
|
|
|
|
Similar Topics
1 insight
, 1 idea contests
, 1 question
Topic on engineering mechanical, production engineering, industrial...
1 trends
, 3 debates
, 2 idea contests
, 5 question
Todays construction sucesses depends on the sucess of Choice of right...
2 trends
, 1 insight
, 2 debates
, 1 idea contests
, 4 question
1 debates
, 1 idea contests
3 trends
, 2 insight
, 21 debates
, 12 idea contests
, 23 question
Sponsored Jobs