VADADARAMGOPALPATNAIK's Profile
VADADARAMGOPALPATNAIK's Experience
| Current : |
Head/VP/GM-Production/Manufacturing, IL&FSREL |
|
| Power | ||
Working from 2009 | ||
| Previous : |
Executive Vice President, In M/S MITCON Consultancy And Engineering Services Ltd |
|
Worked from 2009 to 2011 | ||
Brief summary :
Executive Vice President - Power Projects In M/S MITCON Consultancy and Engineering Services Ltd since Sept 2009 till date Involved in the development, design, engineering, and erection and commissioning of Power Projects up to a total capacity of 600 MW with coal, Bagasse, Biomass and non-fossil fuels for TNEB, Govt of TN Accountable for preparing DPR, analyzing tender documents, evaluating techno-commercial bids, selecting EPC contractor, preparing and finalizing and initiating contracts, monitoring of project site management , evolving CDM and MNES benefits for all projects Assistant Vice President - Power Projects, Mumbai and Pune | ||
| Previous : |
FS Renewable Energy Ltd. |
|
Worked from 2007 to 2009 | ||
Brief summary :
IL and FS Renewable Energy Ltd., Dec 2007 - Sept 2009 Involved in the basic engineering, design and project implementation of bagasse, biomass, Biogas and Coal Power Projects upto a total capacity of 100 mw as Head- Project Implementation Development and Conception for Coal based Power Projects General Manager | ||
| Previous : |
GMR Industries Ltd. |
|
| Srikakulam | ||
Worked from 2006 to 2007 | ||
Brief summary :
GMR Industries Ltd., Mar 2006 - Nov 2007 Entrusted with the responsibility to head profit center operations of 20 MW Cogeneration Power Plant at GMR Industries, Srikakulam and involved in supervising the entire Plant Maintenance of Sugar, Power and Distillery Plants Associated as Champion for 5S and Energy Cell, and for Fuel Switching-CDM Project as well as Internal Auditor for ISO 14001 Managed the techno-commercial aspects of Project including Finance Management, Budgeting and Inventory Control, etc. Implemented Power Projects Select Achievements Received Bagged the AOT- CUMI Award for 5S Implemented the Best Practices on the Shop Floor and empowered the staff to drive business excellence in achieving corporate goals Successfully monitored 5S activities, quality benchmarks, small group activities etc. General Manager | ||
| Previous : |
KREBS Biochemical Industries |
|
Worked from 2004 to 2006 | ||
Brief summary :
KREBS Biochemical Industries, Apr 2004 - Feb 2006 Associated as Profit Center Head for Cogeneration Power Plant and responsible for complete plant maintenance of Pharma, Power Plant and Utilities. Commissioned a KKK make Power Plant of capacity 10 MW (Coal Based) within 13 months Implemented efficient processes that subsequently saved production losses to the tune of INR 5 Crores. Profit Center Head - Cogeneration Power Plant | ||
| Previous : |
E I D Parry Ltd. |
|
Worked from 1995 to 2004 | ||
Brief summary :
E I D Parry Ltd., Mar 1995 - Apr 2004 Development, Design, Erection and commissioning of 40 MW Bagasse based Cogeneration Projects and subsequently took over as Head-Cogeneration Played an active role in driving and implementing capital projects Accountable for supervising complete maintenance of Sugar, Power and Distillery Plants Associated as Champion for Energy Cell - achieved energy savings of INR 150 Lakhs in a year through implementation of reduction in electrical power consumption projects Involved in design, basic engineering study, erection and commissioning of 30 MW Bagasse based cogeneration project Assistant Manager - Electrical | ||
| Previous : |
Coromondel Fertilizers Ltd. |
|
Worked from 1991 to 1995 | ||
Brief summary :
Coromondel Fertilizers Ltd., Sept 1991 - Mar 1995 Involved in Plant Maintenance, managing the air-conditioning and refrigeration and telecom departments Implemented Capital Projects and managed 8MW diesel power plant of Wartsila make. Ensured efficient work processes and recorded a zero downtime in all the 5 Process Plants. Enhanced organizational profitability by cost savings worth nearly INR One Crore and saving production losses. Earlier Experience | ||
| Previous : |
Assistant Engineer, Chemicals Ltd. |
|
Worked from 1987 to 1991 | ||
Brief summary :
GodaVari Fertilizers and Chemicals Ltd., Aug 1987 - Sept 1991 Assistant Engineer - Electrical | ||
| Previous : |
Engineer, Andhra Steel Corporation Ltd. |
|
Worked from 1981 to 1987 | ||
Brief summary :
Andhra Steel Corporation Ltd., Jan 1981 - Aug 1987 Deputy Electrical - Engineer | ||
| Previous : |
ChittivAlsa Jute Mills Ltd. |
|
Worked from 1980 to 1981 | ||
Brief summary :
ChittivAlsa Jute Mills Ltd., Jan 1980 - Jan 1981 | ||
Sponsored Jobs
Featured Career Adviser
Need IT People Think Sampoorna
- Create a confidential Career Profile and Resume/C.V. online
- Get advice for planning their career and for marketing of experience and skills
- Maximize awareness of and access to the best career opportunities
Related Topics
To find ways and means of integrated development of energy resources and...
7 debates
, 1 idea contests
, 2 question
What is the future of marketing in India? The purchasing power of the masses...
3 debates
, 1 idea contests
Discuss on the issues related to managing a team of cultures and generations...
1 insight
, 8 idea contests
, 2 question
Viewers also viewed
|
(48 Points)
|
|
(84 Points)
|





