Build your professional network on facebook via our app Go to app
VADADARAMGOPALPATNAIK Head/VP/GM-Production/Manufacturing, IL&FSREL
 
VADADARAMGOPALPATNAIK's Profile
VADADARAMGOPALPATNAIK
Head/VP/GM-Production/Manufacturing, IL&FSREL
IL&FSREL
confidential
confidential
Mumbai, India
Toostep 
Professional summary
VADADARAMGOPALPATNAIK's Experience
Current :

Head/VP/GM-Production/Manufacturing, IL&FSREL

Power

Working from 2009

Previous :

Executive Vice President, In M/S MITCON Consultancy And Engineering Services Ltd

Worked from 2009 to 2011

Brief summary :

Executive Vice President - Power Projects In M/S MITCON Consultancy and Engineering Services Ltd since Sept 2009 till date Involved in the development, design, engineering, and erection and commissioning of Power Projects up to a total capacity of 600 MW with coal, Bagasse, Biomass and non-fossil fuels for TNEB, Govt of TN Accountable for preparing DPR, analyzing tender documents, evaluating techno-commercial bids, selecting EPC contractor, preparing and finalizing and initiating contracts, monitoring of project site management , evolving CDM and MNES benefits for all projects Assistant Vice President - Power Projects, Mumbai and Pune

Previous :

FS Renewable Energy Ltd.

Worked from 2007 to 2009

Brief summary :

IL and FS Renewable Energy Ltd., Dec 2007 - Sept 2009 Involved in the basic engineering, design and project implementation of bagasse, biomass, Biogas and Coal Power Projects upto a total capacity of 100 mw as Head- Project Implementation Development and Conception for Coal based Power Projects General Manager

Previous :

GMR Industries Ltd.

Srikakulam

Worked from 2006 to 2007

Brief summary :

GMR Industries Ltd., Mar 2006 - Nov 2007 Entrusted with the responsibility to head profit center operations of 20 MW Cogeneration Power Plant at GMR Industries, Srikakulam and involved in supervising the entire Plant Maintenance of Sugar, Power and Distillery Plants Associated as Champion for 5S and Energy Cell, and for Fuel Switching-CDM Project as well as Internal Auditor for ISO 14001 Managed the techno-commercial aspects of Project including Finance Management, Budgeting and Inventory Control, etc. Implemented Power Projects Select Achievements Received Bagged the AOT- CUMI Award for 5S Implemented the Best Practices on the Shop Floor and empowered the staff to drive business excellence in achieving corporate goals Successfully monitored 5S activities, quality benchmarks, small group activities etc. General Manager

Previous :

KREBS Biochemical Industries

Worked from 2004 to 2006

Brief summary :

KREBS Biochemical Industries, Apr 2004 - Feb 2006 Associated as Profit Center Head for Cogeneration Power Plant and responsible for complete plant maintenance of Pharma, Power Plant and Utilities. Commissioned a KKK make Power Plant of capacity 10 MW (Coal Based) within 13 months Implemented efficient processes that subsequently saved production losses to the tune of INR 5 Crores. Profit Center Head - Cogeneration Power Plant

Previous :

E I D Parry Ltd.

Worked from 1995 to 2004

Brief summary :

E I D Parry Ltd., Mar 1995 - Apr 2004 Development, Design, Erection and commissioning of 40 MW Bagasse based Cogeneration Projects and subsequently took over as Head-Cogeneration Played an active role in driving and implementing capital projects Accountable for supervising complete maintenance of Sugar, Power and Distillery Plants Associated as Champion for Energy Cell - achieved energy savings of INR 150 Lakhs in a year through implementation of reduction in electrical power consumption projects Involved in design, basic engineering study, erection and commissioning of 30 MW Bagasse based cogeneration project Assistant Manager - Electrical

Previous :

Coromondel Fertilizers Ltd.

Worked from 1991 to 1995

Brief summary :

Coromondel Fertilizers Ltd., Sept 1991 - Mar 1995 Involved in Plant Maintenance, managing the air-conditioning and refrigeration and telecom departments Implemented Capital Projects and managed 8MW diesel power plant of Wartsila make. Ensured efficient work processes and recorded a zero downtime in all the 5 Process Plants. Enhanced organizational profitability by cost savings worth nearly INR One Crore and saving production losses. Earlier Experience

Previous :

Assistant Engineer, Chemicals Ltd.

Worked from 1987 to 1991

Brief summary :

GodaVari Fertilizers and Chemicals Ltd., Aug 1987 - Sept 1991 Assistant Engineer - Electrical

Previous :

Engineer, Andhra Steel Corporation Ltd.

Worked from 1981 to 1987

Brief summary :

Andhra Steel Corporation Ltd., Jan 1981 - Aug 1987 Deputy Electrical - Engineer

Previous :

ChittivAlsa Jute Mills Ltd.

Worked from 1980 to 1981

Brief summary :

ChittivAlsa Jute Mills Ltd., Jan 1980 - Jan 1981

 
 
Featured Career Adviser
Need IT People Think Sampoorna
  • Create a confidential Career Profile and Resume/C.V. online
  • Get advice for planning their career and for marketing of experience and skills
  • Maximize awareness of and access to the best career opportunities
 
 
 
VADADARAMGOPALPATNAIK's communities
471 members, 4 jobs, 62 articles, 19 questions, 14 debates, 8 idea contests.
 
 
Related Topics
To find ways and means of integrated development of energy resources and...
7 debates , 1 idea contests , 2 question  
What is the future of marketing in India? The purchasing power of the masses...
3 debates , 1 idea contests  
Discuss on the issues related to managing a team of cultures and generations...
1 insight , 8 idea contests , 2 question